Loading...
Engineering Decision Final_Plat.pdfCITY OF EDMONDS ENGINEERING DIVISION Date: August 20, 2019 To: Mike Clugston, Planner From: JoAnne Zulauf, Engineering Technician Subject: PLN20130031, Lindberg - Final Plat 10723 235th Pl SW — 2 lot Short Plat The Engineering Division has found that the subject 2-lot short plat meets the requirements established for civil subdivision improvements in accordance with Edmonds Community Development Code (ECDC) 20.75. Preliminary plat approval was issued by the Planning Division on October 24, 2013 and included engineering conditions of approval attached to the staff report. Civil construction plans were submitted to the Engineering Division on February 20, 2014 consistent with the conditions of approval and ECDC 20.75.120. The plans were approved for construction on October 22, 2018. The improvements shown on the approved civil construction plans were constructed by the contractor and approved by the Engineering Division on June 28, 2019 with the exception of the final driveway paving. Consistent with ECDC 20.75.130, a performance bond has been posted as surety that these improvements will be completed within 12 months following recording of the plat. A performance bond was submitted by the developer and accepted by the City on June 28, 2019 reflecting the total cost to construct all required improvements in the amount of $40,657.50. Consistent with ECDC 18.30.090, a permanent access easement has been granted to the City of Edmonds for access to the private stormwater facility located on Lots B and C. Access is for inspection purposes to ensure that stormwater facilities are properly operated and maintained in accordance with City of Edmonds Code. The subject development did not include street dedications to the City. Thank you. City of Edmonds