Engineering Decision-Final_Plat.pdfCITY OF EDMONDS ENGINEERING DIVISION Date: June 7, 2019 To: Michele Szafran, Planner From: Jennifer Lambert, Engineering Technician Subject: PLN20180024, Select Homes - Final Plat 1122 Viewland Way — 2 lot Short Plat The Engineering Division has found that the subject 2-lot short plat meets the requirements established for civil subdivision improvements in accordance with Edmonds Community Development Code (ECDC) 20.75. Preliminary plat approval was issued by the Planning Division on July 9th, 2018 and included engineering conditions of approval. Civil construction plans were submitted to the Engineering Division on August 21st, 2018 consistent with the conditions of approval and ECDC 20.75.120. The plans were approved for construction on January 30th, 2019. While most of the improvements have been installed and inspected, the plat construction has yet to be completed in it's entirety. Consistent with ECDC 20.75.130, a performance bond has been posted as surety that these improvements will be completed within 12 months following recording of the plat. A performance bond was submitted by the developer and accepted by the City on February 27th 2019 reflecting the total cost to construct all required improvements in the amount of $111,443.28. Consistent with ECDC 18.30.090, a permanent access easement has been granted to the City of Edmonds for access to the private stormwater facility located on Lot 1. Access is for inspection purposes to ensure that stormwater facilities are properly operated and maintained in accordance with City of Edmonds Code. The subject development did not include street dedications to the City. City of Edmonds