Engineering Decision-Final_Plat.pdfCITY OF EDMONDS
ENGINEERING DIVISION
Date: June 7, 2019
To: Michele Szafran, Planner
From: Jennifer Lambert, Engineering Technician
Subject: PLN20180024, Select Homes - Final Plat
1122 Viewland Way — 2 lot Short Plat
The Engineering Division has found that the subject 2-lot short plat meets the requirements
established for civil subdivision improvements in accordance with Edmonds Community
Development Code (ECDC) 20.75.
Preliminary plat approval was issued by the Planning Division on July 9th, 2018 and included
engineering conditions of approval.
Civil construction plans were submitted to the Engineering Division on August 21st, 2018
consistent with the conditions of approval and ECDC 20.75.120. The plans were approved
for construction on January 30th, 2019. While most of the improvements have been installed
and inspected, the plat construction has yet to be completed in it's entirety.
Consistent with ECDC 20.75.130, a performance bond has been posted as surety that these
improvements will be completed within 12 months following recording of the plat. A
performance bond was submitted by the developer and accepted by the City on February 27th
2019 reflecting the total cost to construct all required improvements in the amount of
$111,443.28.
Consistent with ECDC 18.30.090, a permanent access easement has been granted to the City
of Edmonds for access to the private stormwater facility located on Lot 1. Access is for
inspection purposes to ensure that stormwater facilities are properly operated and maintained
in accordance with City of Edmonds Code.
The subject development did not include street dedications to the City.
City of Edmonds