Engineering Decision-Final_Plat.pdfCITY OF EDMONDS ENGINEERING DIVISION Date: April 26, 2019 To: Mike Clugston, Senior Planner From: Jeanie McConnell, Engineering Program Manager Subject: PLN20170028, Jenkins Lane - Final Plat 720 —13th Way SW — 5 lot Plat The Engineering Division has found that the subject 5-lot plat meets the requirements established for civil subdivision improvements in accordance with Edmonds Community Development Code (ECDC) 20.75. The Hearing Examiner's Decision, which provided preliminary plat approval, was issued on November 9, 2017 and included engineering conditions of approval. Civil construction plans were submitted to the Engineering Division on December 22, 2017 consistent with the conditions of approval and ECDC 20.75.120. The plans were approved for construction on June 21, 2018. The improvements shown on the approved plans have not yet been constructed in their entirety. Consistent with ECDC 20.75.130, a performance bond has been posted as surety that these improvements will be completed within 12 months following recording of the plat. A performance bond was submitted by the developer and accepted by the City on August 31, 2018 reflecting the total cost to construct all required improvements in the amount of $231,708.00. As a condition of development the subject plat will dedicate a 10-foot strip of property as public street to the City of Edmonds along 13th Way SW. The dedication was reviewed by the Council's Planning, Parks and Public Works committee on January 23, 2018 and approval was given to forward to the full council. Consistent with ECDC 18.30.090, a permanent access easement has been granted to the City of Edmonds for access to the private stormwater facility located in Tract 999. Access is for inspection purposes to ensure that stormwater facilities are properly operated and maintained in accordance with City of Edmonds Code. Thank you. City of Edmonds