Engineering Decision-Final_Plat.pdfCITY OF EDMONDS
ENGINEERING DIVISION
Date: September 21, 2018
To: Mike Clugston, Planning Division
From: Jennifer Lambert, Engineering Division
Subject: PLN20170033, Fairwinds - Final Short Plat
921 Pine St — 3 lot Short Plat
The Engineering Division has found that the subject 3-lot short plat meets the requirements
established for civil subdivision improvements in accordance with Edmonds Community
Development Code (ECDC) 20.75.
Preliminary plat approval was issued by the Planning Division on March 1, 2018 and included
engineering conditions of approval.
Civil construction plans were submitted to the Engineering Division on March 19, 2018
consistent with the conditions of approval and ECDC 20.75.120. The plans were approved for
construction on August 1, 2018. The improvements shown on the approved plans have not yet
been constructed. Consistent with ECDC 20.75.130, a performance bond has been posted as
surety that these improvements will be completed within 12 months following recording of the
plat. A performance bond was submitted by the developer and accepted by the City on
September 11, 2018 reflecting the total cost to construct all required improvements in the
amount of $96,262.99.
Consistent with ECDC 18.30.090, a permanent access easement has been granted to the City
of Edmonds for access to the private stormwater facility located on Lots 1, 2 and 3. Access is
for inspection purposes to ensure that stormwater facilities are properly operated and
maintained in accordance with City of Edmonds Code.
The subject development did not include street dedications to the City.
City of Edmonds