Engineering Decision-Final_Plat-PLN20130020.pdfCITY OF EDMONDS ENGINEERING DIVISION Date: March 28, 2018 To: Jeri Machuga, Associate Planner From: Jeanie McConnell, Engineering Program Manager Subject: PLN20130020, Soundview Lane - Final Plat 7231 Soundview Lane - 2 lot Short Plat The Engineering Division has found that the subject 3-lot short plat meets the requirements established for civil subdivision improvements in accordance with Edmonds Community Development Code (ECDC) 20.75. Preliminary plat approval was issued by the Planning Division on May 12, 2014 and included engineering conditions of approval in Attachment 21 of the staff report. Civil construction plans were submitted to the Engineering Division on June 12, 2014 consistent with the conditions of approval and ECDC 20.75.120. The plans were approved for construction on April 23, 2015. While some of the improvements have been installed and inspected, the plat construction has yet to be completed in it's entirety. Consistent with ECDC 20.75.130, a performance bond has been posted as surety that these improvements will be completed within 12 months following recording of the plat. A performance bond was submitted by the developer and accepted by the City on July 10, 2017 reflecting the total cost to construct all required improvements in the amount of $193,034.00. Consistent with ECDC 18.30.090, a permanent access easement will be granted to the City of Edmonds for access to the private stormwater facility located within Tract X — Ingress, egress and Utilities Easement. Access is for inspection purposes to ensure that stormwater facilities are properly operated and maintained in accordance with City of Edmonds Code. The subject development did not include street dedications to the City. Thank you. City of Edmonds