Engineering Division Final Approval Memo.pdf
CITYOFEDMONDS
ENGINEERING DIVISION
Date:
April 20, 2015
To:
Jen Machuga, Planner
From:JoAnne Zulauf, Engineering Technician
Subject:
PLN20080038,Pride Ventures-Final Plat
th
2142580Ave W–3lot Short Plat
The Engineering Division has found that the subject 3-lot short plat meets the requirements
established for civil subdivision improvements in accordance with Edmonds Community
Development Code (ECDC) 20.75.
Preliminary plat approval was issued by the Planning Division on July 25, 2008and included
engineering conditions of approval in Attachment 4 of the staff report.
Civil construction plans were submitted to the Engineering Division on April 3, 2014
consistent with the conditions of approval and ECDC 20.75.120. The plans were approved
for construction on July 11, 2014. The improvements shown on the approved civil
construction plans were constructed by the contractor and approved by the Engineering
Division on April 13, 2015.Theperformance bondin the amount of $27,355.44 for right of
way improvementswill be released upon receipt of a maintenance bond submitted by the
developerin the amount of $15,347.86.
As a condition of development the subject plat will grant to the City of Edmonds a 15-foot
wide public stormwater utility easement for inspection of drainage facilities across lots 1, 2,
and 3.
The subject development did not include street dedication to the City.