Loading...
Engineering Division Final Approval Memo.pdf CITYOFEDMONDS ENGINEERING DIVISION Date: April 20, 2015 To: Jen Machuga, Planner From:JoAnne Zulauf, Engineering Technician Subject: PLN20080038,Pride Ventures-Final Plat th 2142580Ave W–3lot Short Plat The Engineering Division has found that the subject 3-lot short plat meets the requirements established for civil subdivision improvements in accordance with Edmonds Community Development Code (ECDC) 20.75. Preliminary plat approval was issued by the Planning Division on July 25, 2008and included engineering conditions of approval in Attachment 4 of the staff report. Civil construction plans were submitted to the Engineering Division on April 3, 2014 consistent with the conditions of approval and ECDC 20.75.120. The plans were approved for construction on July 11, 2014. The improvements shown on the approved civil construction plans were constructed by the contractor and approved by the Engineering Division on April 13, 2015.Theperformance bondin the amount of $27,355.44 for right of way improvementswill be released upon receipt of a maintenance bond submitted by the developerin the amount of $15,347.86. As a condition of development the subject plat will grant to the City of Edmonds a 15-foot wide public stormwater utility easement for inspection of drainage facilities across lots 1, 2, and 3. The subject development did not include street dedication to the City. City of Edmonds