Engineering Final Doc Approval.10.24.16.doc
CITY OF EDMONDS
ENGINEERING DIVISION
Date:October 24, 2016
To:Mike Clugston, AICP, Associate Planner
From:JoAnne Zulauf, Engineering Technician III
Subject:
PLN20150011, Simonova Zaretski - Final Short Plat
th
8721 196 St SW – 2 lot Short Plat
The Engineering Division has found that the subject 2-lot short plat meets the requirements
established for civil subdivision improvements in accordance with Edmonds Community
Development Code (ECDC) 20.75.
Preliminary plat approval was issued by the Planning Division on May 20, 2015 and included
engineering conditions of approval in Attachment 4 of the staff report.
Civil construction plans were submitted to the Engineering Division on July 16, 2015
consistent with the conditions of approval and ECDC 20.75.120. The plans were approved for
construction on February 12, 2016. The improvements shown on the approved civil
construction plans were constructed by the contractor and approved by the Engineering
Division on September 28, 2016. A performance bond was submitted by the developer and
accepted by the City on April 1, 2016 reflecting the cost to construct all improvements in the
public right of way of the amount of $22,445.76. At completion of construction a maintenance
bond was submitted by the developer and accepted by the City in the amount of $10, 721.23.
Consistent with ECDC 18.30.090, a permanent access easement has been granted to the City
of Edmonds for access to the private stormwater facility and it’s appurtances located on Lot 1
and Lot 2. Access is for inspection purposes to ensure that stormwater facilities are properly
operated and maintained in accordance with City of Edmonds Code.
The subject development did not include street dedications to the City.