Loading...
Engineering Memo of Compliance-PLN20180014-15-16-17.pdfDate: To: From: Subject: MEMORANDUM June 25, 2018 Mike Clugston, Senior Planner Jeanie McConnell, Engineering Program Manager Zachary Richardson, Stormwater Engineer PLN20180014-15-16-17 — Design Review, CU, Variances Edmonds Woodway Fields — 21600 76" Ave W Engineering has reviewed the subject application and found the information provided is consistent with Title 18 Edmonds Community Development Code & Engineering standards. It is requested that the following be included as a condition of project approval. Compliance with Engineering codes and construction standards will be reviewed with the building permit application for development of the site. Approval of the design review phase of the project does not constitute approval of the improvements as shown on the submitted plans. A right-of-way dedication will be required at the building permit phase of this project to clear up an existing right-of-way/parcel bouncary discrepancy. This plans submitted for the current phase of the project has accurately accounted for this area as right-of-way. Thank you. City of Edmonds