June 25, 2018
Mike Clugston, Senior Planner
Jeanie McConnell, Engineering Program Manager
Zachary Richardson, Stormwater Engineer
PLN20180014-15-16-17 — Design Review, CU, Variances
Edmonds Woodway Fields — 21600 76" Ave W
Engineering has reviewed the subject application and found the information provided is
consistent with Title 18 Edmonds Community Development Code & Engineering standards.
It is requested that the following be included as a condition of project approval.
Compliance with Engineering codes and construction standards will be reviewed with the
building permit application for development of the site. Approval of the design review phase
of the project does not constitute approval of the improvements as shown on the submitted
plans.
A right-of-way dedication will be required at the building permit phase of this project to clear
up an existing right-of-way/parcel bouncary discrepancy. This plans submitted for the current
phase of the project has accurately accounted for this area as right-of-way.