Loading...
Engineering Request for Info 1.pdfDate: To: From Subject: MEMORANDUM June 4, 2019 Mike Clugston, Senior Planner JoAnne Zulauf, Engineering Technician Zachary Richardson, Stormwater Engineer Mike Delilla, Utility Engineer Bertrand Hauss, Transportation Engineer PLN20190021—Design Review Main Street Commons — 550 Main St. The comments provided below are based upon review of the application and documents submitted for the subject application. Additional information is requested from the applicant at this time. Please ask the applicant to respond to the following. Transportation Engineer Review: The following comments are provided by the City Transportation Engineer, Bertrand Hauss. Please contact Bertrand directly at 425-771-0220 or by email at Bertrand.hausskedmondswa.gov with any specific questions you may have regarding his comments. 1. Please revise traffic impact worksheet to reflect the new use of the existing building as Specialty Retail per 5/24 email from Jeanie McConnell to Mike McMurray. General Engineering Review: The following comments are provided by the Engineering Technician, JoAnne Zulauf. Please contact JoAnne directly at 425-771-0220 or by email at Joanne.Zulau&edmondswa.gov with any specific questions you may have regarding his comments. 1. The sidewalks are called out as 10' in width but the scaling does not appear to match. Please revise and resubmit plans. 2. Please show the location of bike racks on the plan. 3. The City of Edmonds does not allow private force mains to connect directly to the public catch basin (or in the right of way). Revise design to show a gravity connection from property line to catch basin. Utility Engineer Review: The following comments are provided by the Engineering Technician, Mike Delilla. Please contact Mike directly at 425-771-0220 or by email at Mike.Delilla a,edmondswa.gov with any specific questions you may have regarding his comments. 4. The invert elevations provided for the storm line from the pump to the catch basin appear to conflict with the placement of the water and fire lines. Please revisit to review elevations of line placement. 5. Each water service and the fire line shall have individual connections to the public main. (also, water meters shall be placed at back of curb within the "streetscape zone".) Thank you.