Loading...
Engineering Requirements S-92-0022.pdfCITY OF ED?IONDS PLANNING DIVISION Jfi!] 111 d File # S-92-0022 Address: 7527 172nd St. S.W. APPLICANT: 'Beh7ad D. Agah DECISION: Approve the proposed 4 -lot short subdivision subject to the Engineering Department requirements and the conditions listed below. ANALYSIS OF DESIGN 1, Lot sizes and Dimensions: a. Existing number of lots 1 Proposed number of lots 4 b. Areas and setbacks: Lot areas for lots 1-3 are adee uate for the 'l S-12 zone.. Leat 4 is adequate fear the RS -20 zone. C. Comer Lots: Lot 1 is a corner lot. 2. Lot arrangement to topography: Satisfactory 3. Flag lot determination: Lot 4 would be a flag lot. 4. Consistent with the purposes of the Zoning Ord.? Yes, C0N,F0RMANCE TO COMPREHENSIVE PLAN' 1. Conforms to the policies of the Comp. Plan? Yes ENVIRONMENTAL ASSESSMENT 1. Environmentally Sensitive Area? Yes. 2. Shoreline Permit? N/A 3. Env. Cklist Req'd? Yes. 4. Negative Declaration? Yes. 5. EIS Req'd? No 6. Env. Assessment Form? Yes. IIIA` IIIR D IMPROVEMENTS ANDIXEDICATIONS 1. See City Engineer's Report. 2. Parks or other facilities? None. 3. Special requirements or conditions: See conditions below, WITNESS TESTIMONY The applicant, Behzad D. Agah, was the only witness who attended the hearing, and no comments were received from the public regarding this proposal. No comments or concerns were raised at the hearing. IMA NOTICE OF APPEAL DATE: 3/2/92 WRITTEN APPEALS ALLEGING SPECIFIC ERROR OF FACT OR OTHER GROUNDS FOR APPEAL MAYBE FILED WITH THE PLANNING DEPARTMENT WITHIN TEN WORKING DAYS OF THE DATE OF THIS DECISION. IN THIS MATTER, ANY APPEAL MUST BE RECEIVED BY THE DEPARTMENT PRIOR TO 5:00 P.M. 3/16/92. S-92-0022 PLANNING DIVISION CONDITIQNS, Qff APPROVAL FH,E NO. S-92-0022 CONDITIONS 1. All Engineering Division conditions listed on Exhibit 2 shall be complied with. 2. Setbacks must be added to the plat map for the final recording papers. 3. A tree clearing plan shall be submitted for City of Edmonds Planning Department approval prior to removal of any trees on lots 1 and 2. Tree removal shall be limited to building pads and driveways only. 4. Temporary erosion control devices shall be installed prior to any tree removal on the subject property. The Edmonds Engineering Division shall be contacted for an inspection of these devices. 5. Fill permits shall be obtained from the Edmonds Building Division prior to any filling on the property. Grading permits shall be obtained from the Building and Planning Divisions prior to any grading. 6. Driveway slopes shall not exceed 14 percent on the lots. CITY OF EDMONDS EXHIBIT ENGINEERING REQUIREMENTS FOR PLATS AND SUBDIVISIONS � NAME • Agah FILE NO HEARING DATE: VICINITY: 7527 - 172nd St. S.W. Req'd Req'd Prior to W/Bldg. Bond Recrdin2 Permit Posted Complete 1. Rights -of -Way for Public Streets: 2. Easements (City utilities, private access, other utilities): Provide access easements 30' width minimum. x 3. Street improvements (ACP with curb & gutter): Provide minimum 20' asphalt width, plus curb and gutter. x 4. Street turnaround: Provide standard cul-de-sac. x 5. Sidewalks and/or walkways: 6. Street lights: 7. Planting strip: 8. Water system improvements (pipelines, fire hydrants, pump stations, telemetering, D.S.H.S., etc.): Provide services to lots. x 9. Sanitary sewer system improvements (pipe- lines, pump stations, telemetering, health district, etc.): Provide services to lots. x 10. Storm sewer system improvements (pipelines, pump station, D.O.E., fisheries, etc.): Provide services to lots. AGAH/TXTFORMS x x x x x Engineering Requirements. °age 2 Req 'd Req'd Prior to W/Bldg. Bond Recrding Permit Posted Complete 11. On-site drainage (plan per Ord. 1924): Provide detention for each new house. x 12. Underground wiring (per Ord. 1387): x 13. Excavation and grading (per UBC, C apter 70): Provide plan, if required, for utility/road development. x 14. Signage (per City Engineer): Provide street sign and stop sign for private road. x 15. Survey monumentation (per Ord., Sec. 12.10.120): 16. As -built dri awngs (per City Engineer): If required for utility development. x x 17. Other requirements: a) Plat showing lots, easements, legal survey info. x b) Legal documents for each lot x c) Field staking - lot corners (by professional surveyor) x d) Maint. agree. (private road & util.) x e) Utility development plan x f) Traffic study x g) Others x (Lot 1 to access only onto private street. No direct access to 76th.) 18. Engineering Fees: a) Drainage system design review @ $30/lot x b) Sewer connection charge/LID assessment x c) Subdivision improvement inspection fee 2.20 of the approved cost est. x d) Other related fees EDMONDS Date The Engineering requirements have been completed and the subdivision can be recorded. Authorized for recording by: Date: nr_nu /TVTrnoMC