Loading...
ENGINEERING RESPONSE - ENG.pdfRoss Engirveering Design May 22, 2016 Tom Leren The Leren Company Inc PO Box 12863 Kill Creek, WA 98082 RE: Plan Check BLD2016-0348 Sanger SFR 1 of 14 1"I",irk Dear Tom: The following Items are in response to the plan check comments by the City of Edmonds dated May 13, 2016. 1. Detail 11/S2 may or may not apply depending on fin -at site grading. It is intended to give the contractor flexibility to determine foundations steps in the field. This detail is reference to from detail 17/S2 'Typical Stepped Foundation". Supporting calculations are attached pages 3 thru 12. 2. Supporting calculations for details 14/S9 and 15/59 are attached pages 13 and 14. 3. A retaining wall along the driveway near Grids G and 6 may be necessary depending on final grading. Detail 11/S2 may be used at this location provided a driveway pavement, slab is present to resist sliding. Please also find attached SK -S-1 with a minor revision to the retaining wall schedule and forward to the contractor. Feel free to contact me with any further questions. Sincerely, Ryan Ross, PE Ross Engineering Design Phone: (425) 314-2373 Email: rjr-- (enclosure)