Loading...
Engineering Response Letter_20180426.pdfOGROUPFIOURinc. P.O. Box 1059 Lake Stevens, Washington 98258 (425) 408-1152 Fax (425) 877-1341 e-mail: info@grp4.com Brad Shipley, Associate Planner City of Edmonds Development Services Department 1215t" Avenue North Edmonds, WA 98020 Re: Meadowdale Short Plat; PLN20170057 Group Four No. 17-0523 Dear Mr. Shipley, April 25, 2018 APR 2,- DEVo U. 4,' , CES I am responding to the comments in your Planning Review Comments letter dated April 11, 2018, for the project referenced above. The comments are addressed as follows: Engineering Review: Please see the attached comments from the Engineering Division, including Storm water. 1. The project does not appear to be satisfying the retrofit requirement per ECDC 18.30.060.D.b.i; the project must mitigate storm water using MR #5 for 25% of the existing impervious surfaces on Lot 1 in addition to mitigation for new plus replaced surfaces on Lot 2. The proposed plan & report have been revised to include the retrofit requirement, as noted. 2. It is unclear why the engineer selected rain gardens as the most appropriate BMP for the site; List 1 must be reviewed in -order (top to bottom) and it appears that the design infiltration rate above 5 in/hr allows for the full use infiltration and pervious pavements on -site. Revise design to implement first feasible BMP option on list and/or revise report to expand on the infeasibility of each BMPs not selected for use. The plan & report have been revised, the rain gardens have been replaced with infiltration and pervious pavements, and the infeasibility of methods not selected is provided. 3. Per Edmonds Addendum Checklist #4, an additional correction factor of 0.9 (for influent control) is required to be applied to the design infiltration rate; revise drainage report as needed to use corrected design infiltration rate. The drainage report is revised to include the correction factor applied to the design infiltration rate, as noted. Meadowdale SP; #17-0523 Page 1 of 2 LAND SURVEYING CIVIL ENGINEERING LAND USE PLANNING PROJECT MANAGEMENT Planning Review: 1. Lot Area. Access easements do not count toward lot area. The proposed 25" access and utility easement reduces the proposed Lot 2 below the minimum required lot area of 12,000 sf. € Revise the proposal to meet this criterion. The proposed lot configuration has been revised to delete the access easement across Lot 2, and the proposed lot area for Lot 2 does meet the minimum of 12,000 SF. 2. Site Plan. € Add names of adjacent property owners. The names of the adjacent property owners have been added to the short plat map, as requested. € Setbacks are measured from the property line or access easement. Adjust the southern side setback for Lot 2. Side setbacks are 10 feet. Additionally, correct the western side setbacks for both lots from 25 feet to 10 feet. The setback lines for both lots have been corrected on the short plat map, including the western side yard setback for Lot 1. Lot 2 is a corner lot, which requires a street setback for each frontage, and allows side yard setbacks for interior lot lines. There is no longer a setback required from the access easement, as it has been deleted. Please feel free to contact me with any questions or additional comments. Sincerely, GROUP FOUR, INC. Ken Williams Senior Project Manager Meadowdale SP; #17-0523 LAND SURVEYING CIVIL ENGINEERING LAND USE PLANNING Page 2 of 2 PROJECT MANAGEMENT