Plan Review Corrections
# bld20061298 & bld20061299 September 26, 2007
Application : Date:
th
Belanich / 7510 & 7512 210 St SW
Project Name/Address:
Jordan Kostelyk / e-mail: jordyk@earthlink.net
Contact Person/Address/Fax:
Reviewer: Jeanie McConnellDivision:Engineering
During review of the subject submittal it was found that the following information, corrections, or
clarifications will need to be addressed:
GENERAL
1.ok
2.ok
3.ok
4.9/26/07 To date a revised traffic control plan (TCP) has not been submitted. Engineering cannot
sign off on the building permit until the TCP has been reviewed and approved.
Traffic control plan was submitted, thank you. Please revise the traffic control plan to include
8/3/07
o
road construction ahead signage, flagger signage and placement of flaggers. This will be required during
the paving operation.
5.ok
6.ok
7.ok
8.ok
9.9/26/07 A performance will need to be submitted prior to issuance of the building permit.
Please submit a performance bond for all right-of-way improvements in the amount of
8/3/07
o
$29,541.55. Bond forms can be obtained from Theresa Umbaugh, Permit Coordinator.
Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please
contact me at 425-771-0220 or by e-mail at mcconnell@ci.edmonds.wa.us if you have specific questions
regarding these plan corrections.