Loading...
Engineering Review Comments 1.pdfof Ell-'Vo CITY OF EDMONDS PLAN REVIEW COMMENTS 4�3"'A ENGINEERING DIVISION .(425) 771-0220 City Website: www.edmondswa.gov DATE: November 7, 2018 TO: Kayla Clark Kayla.clark@outlook.com FROM: Jennifer Lambert, Engineering Technician Jennifer.lambert@edmondswa.gov RE: Application 4: BLD20181126 Project: Select Homes — Single Family Residence Project Address: 1122 Viewland Way During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please submit revised plans/documents including a written response to each item below. Resubmittals can be made at the Development Services Department on the 2nd floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details, application and other forms, and development code may be referenced on the City website: www.edmondswa.gov under Services/Permits and Development. ***Per the applicant, the review of this single family residence is being reviewed in conjunction with the short plat (PLN20180024). If the short plat does not proceed, a new set of plans will need to be submitted that do not show the short plat improvements, but what is required as part of a new single family residence. This plan may not be issued until the Civils for the short plat have been approved and issued. *** GENERAL 1) Submit Side Sewer Permit Application form 2) Note AFN's for all easements and/or recording documents for proposed easements as applicable (may reference short plat number). 3) Consistent with Edmonds Community Development Code 18.80.060, driveway slopes shall not exceed 14% slope. Please indicate this requirement on the plans. Sheet 1 of 3 — SITE DEVELOPMENT PLAN WATER 1) As indicated by the Fire Department, a fire sprinkler system is required for this property. Typically if there is an existing water service line from the watermain to the meter, the water service line/meter will not be the appropriate size and a new tap will be required. The applicant will be required to pay for the new tap on the main and the new meter. Please revise plans to include the following: a. Please add a note that a 1" meter is to be installed b. Show the water meter located in the right-of-way, such that the back of the meter is on the property line. The water meter shall not be located within the driveway. 2) Add a note to the plans indicating where the landscape irrigation backflow assembly will be located (if one is proposed). SEWER 1) Add the invert elevation at the stub (installed with the short plat). STORM 1) Show where the retaining wall drainage will discharge to if drains are to be installed. 2) The surface water runoff from the driveway shall not sheet flow over the sidewalk. Please show the surface water runoff from the driveway being collected and discharged to the onsite stormwater management system. DRY UTILITIES No Comments Sheet 2 of 3 — GRADING AND TESC PLAN TESC 1) Please show and add a note to the plans that filter socks will be added to any catch basins downstream from the construction site. Please reference the Edmonds Standard Detail. 2) Add note: Install and maintain all TESC measures according to approved plans, City of Edmonds standard details, and all other measures that may be required during construction. Sheet 3 of 3 — GENERAL NOTES & DETAILS No Comments STORMWATER ENGINEER REVIEW Refer to separate review comments by City Stormwater Engineer, Zachary Richardson. Please contact Zack directly at 425-771-0220 or by email at zachary.richardson(d,edmondswa.2ov with any specific questions you may have regarding his comments. Page 2 of 2