Loading...
Engineering.Storm.Traffic Memo-Need More Info-Design Review-PLN20180060-GRE.pdfDate: ral MEMORANDUM October 23, 2018 Brad Shipley, Associate Planner From: Jeanie McConnell, Engineering Program Manager Zachary Richardson, Stormwater Engineer Bertrand Hauss, Transportation Engineer Subject: PLN20160054 —Design Review Westgate Mixed Use Zone Westgate Village - 10032 Edmonds Way Stormwater Engineer Review: Refer to attached plan review comments by City Stormwater Engineer, Zachary Richardson. Please contact Zack directly at 425-771-0220 or by email at Zachary.richardson(kedmondswa.gov with any specific questions you may have regarding his comments. Transportation Engineer Review: The following comments are provided by the City Transportation Engineer, Bertrand Hauss. Please contact Bertrand directly at 425-771-0220 or by email at Bertrand.haussgedmondswa.gov with any specific questions you may have regarding his comments. 1. The Traffic Study provided is not the most current version. If you intend to utilize the traffic study completed with the previous proposal, please submit the most current version. General Engineering Review: The following comments are provided by the Engineering Program Manager, Jeanie McConnell. Please contact Jeanie directly at 425-771-0220 or by email at Jeanie.mcconnellgedmondswa. -og_v with any specific questions you may have regarding his comments. Please update project Perspectives (pages 22-29) to reflect the following: a. Sidewalks along 2341h St SW b. Corner curb ramp at 234th and Hwy 99 2. The plans indicate the power lines and associated appurtenances will be placed underground adjacent to the subject property along Highway 99. Please provide confirmation that PUD is aware of this proposal and at a preliminary level finds this to be acceptable. of EDM STO RM WATE R REVIEW COMMENTS City of Edmonds Engineering Division To: Applicant Date: October 19, 2018 Project Name: Gre Edmonds 192-unit Permit Number: PLN20180060 Address: 23326 Highway 99 Review Type: Design Review (Preliminary) Submittal Date: 10/1/2018 Reviewer: Zack Richardson, PE City of Edmonds, Stormwater Engineer Recommendation: I recommend that PLN20180060 be withheld until the comments below are adequately addressed. Review Comments: 1. It does not appear that any drainage information was submitted; prior to preliminary approval, the applicant shall review ECDC 18.30 and the Edmonds Stormwater Addendum and submit storm water site plans and report consistent with those codes sections a. The report submitted under the `drainage report' tab appears to be no more than an expanded geotechnical study; it is not a full drainage report. b. The drainage report shall include all require elements per SWWMM, and preliminary sizing for any BMPs proposed (including the proposed vault). i. Reviewer must be able to confirm that sufficient room has been left for the treatment BMPs/facilities prior to preliminary approval. 2. The geotechnical information submitted may not be sufficient to have ruled out the application of bio-retention BMPs; consult Edmonds Addendum Appendix A for infeasibility criteria and explicitly list infeasibility for each BMP on the list (in order) within the text of the drainage report. Page 1 of 1