Engineering_Comments_2_C&A Response.pdfCECIL ASSOCIATES April 5, 2019 JoAnne Zulauf Engineering Division 121 51h Avenue N Edmonds, WA 98020 RE: BLD20181498 — Mazda Service Center Response to Review Comments (Engineering) Dear JoAnne: We have reviewed the engineering comments memorandum dated March 6, 2019. The civil plans and reports have been revised accordingly to address the City's comments shown in the letter. The City's comments have been copied below. The engineering comments did not require any plan updates other than details about the water connections. However, planning and building comments related to the building design has triggered the following: - A revised fire riser room (NW corner of the building). The revised room location was done to accommodate an exterior door for access. An associated retaining wall and concrete walkway were added to the north side of the building. - West side, the stair to level 2 was deleted and replaced with a concrete ADA access ramp. An ADA parking stall was added in conjunction with this ramp. - Two standard parking stalls were added for updated floor areas. The plans have been updated for the revisions mentioned above, driven by building revisions. The added impervious area was tracked in the updated drainage report, approximately 1,227sf of new PGIS. (see tables on page 7 and 8). I've attached a recuced-size architectural site plan with the changes clouded for clarity. Below, comment responses and a description of plan updates has been added after each comment as applicable. Please review and verify that we have adequately addressed each comment. 1. Please revise the plans to show a pressure connection for the fire connection and hydrant on 761h Ave W. RESPONSE: The fire service and fire hydrant connection tees have been revised to wet taps. The City standard detail has been added to the water detail sheet as well. Mazda Service Center Response to Review Comments 2 April 5, 2019 Please review Traffic Impact Handout E82. Complete the worksheet for the Change in Use section noting the increase in square footage of the structure or provide an independent calculation. RESPONSE: Traffic Analysis handout E82 has been provided. A copy is included with this submittal. We look forward to hearing a response to see if the engineering comments have been addressed. We will do our best to coordinate, as needed, between the multiple permits and projects. Thanks in advance. Sincerely, John C. Farleigh, P.E. Cecil & Associates, LLC CC: Frank Karreman (Architect) Marc Ikegami (Owner) Doug Ikegami (Owner) A llrHTlNr.Rr.HFnmr I SITE PLAN SCALE 1"=30'-0" @ 3 1 r I k Er 6 h i t—t. r. I design 11. 16.18 119m., Ar, 3 1 r I k architecture I design 265 "i..1— W.y East Suite 202D Bainbridge Island Washington 98110 telephone 2 0 6 8 4 2 1253 e-mail NSULTANTS U� L PERGOLA PLAN c`� ' � `­L�ul (:5) SCALE: 0 cl) LU >- < z LLJ 0 oo UJ cy) N. 0 'NP 11A, 2J U LL ll=�IA ...... U) .T_ LU �j 'ji L _T_ —A— IS ma (N LU A EXTERIOR STAIR n ACCESSIBILITY SIGNAGE — SCALE: Nrr.��� SITE PLAN, & SITE DETAILS SCALE I NOTED ISSUE DATE 11.1618 REVISIONS Z��\ 21-19 RT.32' �'—oE �'�_LPLP—T� PERMIT REVISIONS wnu A 4IoWjq -CxAxGs PERMIT REVISIONS SECTION @ WALL SECTION @ WALL S-0— PERMIT SET 2 SECTION 'W- VV�`­`­ SCALE l.'=l-V (D SCALE: 11'1`=�l (Y �­ A1.0