Loading...
Enginnering Comments 2.pdfof Ellzvo CITY OF EDMONDS N PLAN REVIEW COMMENTS ., ENGINEERING DIVISION 14'sr. , s9° (425) 771-0220 City Website: www.edmondswa.gov DATE: July 24, 2019 TO: Steven Gerken steve@slgci.com FROM: Natalie Griggs, Engineering Technician natalie.griggs@edmondswa.gov RE: Application #: BLD20190653 Project: Griffith Pool Project Address: 321 2nd Ave N During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please submit revised plans/documents including a written response to each item below. Resubmittals can be made at the Development Services Department on the 2nd floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon. City of Edmonds handouts, updated standard details with new reference numbers, application and other forms, and development code may be referenced on the City website: www.edmondswa.gov under Services/Permits and Development. June 19, 2019 Comments July 24, 2019 Comments GENERAL 1) OK 2) June 19, 2019: The proposed pool is depicted to be immediately adjacent to the infiltration trench. Please provide response per Stormwater Review Comments. July 24, 2019: Please provide response per Stormwater Engineering Comments. 3) June 19, 2019: Please note on the plans that draining the pool will require obtaining a Side Sewer Permit from the City of Edmonds. July 24, 2019: A Side Sewer Permit is required each time a pool is drained. Please note on the site plan that a Side Sewer Permit shall be obtained when draining the pool. TESC 1) OK 2) OK 3) OK