Loading...
Engr Estimates & Bond Amounts.pdfMARCUS STRASH ENGINEER'S COST ESTIMATE — ON-SITE 802007 ITEM QUANTITY COST PER UNIT COST Sidewalk &Paving: Asphalt & Base Driveway 262 SY 23.00 6,026.00 Drainage: CB's -Type 1-L 5 750.00 3,750-00 C3 -Type 1 1 650.00 650,00 12" N-12 Pipe 10 LF 18.50 333.00 18" N-12 Pipe 191 LF 32,50 6,207.50 6" PVC 1108 LF 6.50 702.00 TESC: Site Prep, Clearing & Grubbing 1 Lump Sum 3,500.00 Filter Fence 60 LF 6.00 360.00 Grading 4,500.00 TOTAL T 26,028.50 Prepared By: Donna L.a Breske, P.E. 6621 Foster Slough Road Snohomish, WA 98290 425-334-9980 6 j az (3 re a ')y - — ------- - SIV '"i U MAk�_ Cj 1^-tP(ZOVEA46-N* -re 2V 31 x 1? 0 & 3 Z -d 9L26-219-9Zt, pjojsun� eill!q BVq:LL Zo CL ADN MARCUS STRASH ENGINEER'S COST ESTIMATE — OFF-SITE IMPROVEMENTS 8/112007 ITEM QUANTITY COST PER UNIT Sidewalk & Paving: Asphalt Sidewalk & Base 425 SF 4.00 Vertical Curb 90 LF 14.00 Asphalt & Base, road widening 38 SY 27.00 Drainage: CB's—Type 1 2 650.00 12"N-12 Pipe 12 LF 18.50 TESC: Temp. CB Sediment Trap 2 550.00 TOTAL Prepared By: Donna L.a Breske, P.E. 6621 Faster Slough Road Snohomish, WA 98290 425-334-9960 E0 L% Co S-r OF E 1M'PRc'V 6-T Al Cm "T PL i F A 4Z 1.4 C"", COST 1,700.00 1,260.00 1,026.00 1.300.00 222.00 1,100.00 6.608.00 C55, . 16, CA q L86 -PJ P -q7.17 pio4sun-1 eilliq Bqq:LL in PL AON