MEMORANDUM
January 31, 2018
Jennifer Machuga, Associate Planner
Jeanie McConnell, Engineering Program Manager
PLN20180003 — Landscape Modification
Harbormaster Homeowners Assoc — 200 2nd Ave N #102
Engineering has reviewed the subject application and found the information provided is
consistent with Title 18 Edmonds Community Development Code & Engineering standards.
It is requested that the following be included as a condition of project approval.
1) Vehicles and equipment shall be located on private property. Should it be necessary to
utilize any portion of the City right-of-way, including the street or sidewalk, to
perform any of this work then the contractor shall apply for and obtain a right-of-way
construction permit in advance of starting. A traffic control plan will be required
as part of the right-of-way permit application.
2) Contractor/owner is responsible for keeping all debris on site and preventing any silt
laden runoff from leaving the site and/or entering the city storm system.
3) Contractor/owner shall repair/replace any damaged sections of curb/gutter, sidewalk
or other public improvements in City right-of-way per City standards that is caused by
or occurs during the permitted project.
4) Contractor/owner is responsible for locating all on -site utilities and any utilities on
neighboring properties that could be impacted by the tree removal.
Relocation/revision/repair to any utilities may require separate permit.
Thank you.
City of Edmonds