Loading...
ENGR RQMNTS - Govier SP-11.4.14.pdf CITY OF EDMONDS 121 - 5TH AVENUE NORTH, EDMONDS, WA 98020 PUBLIC WORKS DEPARTMENT - ENGINEERING DIVISION REQUIREMENTS FOR SHORT PLATS Planning Division File Number:PLN20140058 To: JoAnne Zulauf, Engineering Technician From: Engineering Division November 4, 2014 Date: Govier 2 Lot Subdivision Project: 23326 & 23402 75th Ave W Address: Required as a Required as a Requirement Condition of Condition of Already Building Permit SubdivisionSatisfied Right-of Way Dedication for Public Streets: 1. a) N/A 2.Public Street Improvements & Access (Asphalt, curb, gutter and sidewalks): a) N/A 3.Private Access Requirements & Improvements: Provide asphalt or concrete driveway approach on 23402 75th per City a) X Code. 4.Street Turnaround: N/A a) Easements 5. (City utilities, private access, other utilities): N/A a) 6.Street Lights: N/A 7.Planting Strip: N/A a) 8.Water System Improvements (OVWSD): N/A a) 9.Sanitary Sewer System Improvements (OVWSD): N/A a) 10.Stormwater System Improvements: Provide Stormwater Management in compliance with ECDC 18.30, a) Stormwater Supplement. X 11.Underground Wiring (per Ord. 1387): ENGR RQMNTS - Govier SP-11.4.141 of 2 form revised 09.10.2014printed 11/4/2014 Required as a Required as a Requirement Condition of Condition of Already Building Permit SubdivisionSatisfied Required for all new services. a) X 12.Excavation and Grading (per IBC) Submit a grading plan as part of engineered site plan. a) X 13.Signage and Striping (per City Engineer): N/A a) 14.Survey Monumentation (per Ord., Sect. 12.10.120): N/A a) 15.As-built Drawings (per City Engineer): N/A a) 16.Other Requirements: Plat showing lots, easements, legals, survey information a) X X Legal documents for each lot b) X Field stake lot corners (by professional surveyor) c) X Field stake utility stubs at property lines d) X 17.Engineering Fees: N/A a) ENGR RQMNTS - Govier SP-11.4.142 of 2 form revised 09.10.2014printed 11/4/2014