Loading...
EngrReqtsPLN20080037_2prelim_approval.pdf CITY OF EDMONDS ENGINEERING REQUIREMENTS FOR SHORT PLATS Reimer 3-Lot Short Plat Name:File No.: PLN20080037 Reviewed by:ddress: A Ed SibrelJanuary 14, 20098805 - 220 St SW Engineering DivisionDate Required as a Preliminary Approval Required as a Requirement Condition of Condition of Already SFR Building SubdivisionSatisfied Permit Right-of Way Dedication for Public Streets: 1. a) X Recorded 10' dedication on 220th St SW b)X Show extent of vacated ROW per Ordinance 3115 2.Public Street Improvements (Asphalt, curb, gutter and sidewalks): a) X Curb and gutter along 220th St ROW frontage b) X Sidewalk along 220th St ROW frontage c) X Retaining wall to be moved and reconstructed d) X New driveway entrance from 220th to be constructed to city standards e) Existing driveway entrance to be removed and replaced with standard X curb/gutter/sidewalk 3.Private Access Requirements & Improvements: All lots shall take access off private access road. a) X i. Private access road shall be paved to 16.0' in width, plus 18" asphalt thickened edge, 6" concrete extruded curb, or inverted crown may be X used to direct water. ii. Slope of private access road and driveways shall not exceed 14% X and shall be noted as such on the civils. iii. Cross slope of private access road shall not exceed 2%X All driveway entrances shall meet sight distance requirements set forth b) by the American Association of State Highway and Transportation X Officials (AASHTO). Slope of driveways shall not exceed 14% and shall be noted as such c) X on the civils. Street Turnaround: 4. Provide on-site turnaround for Lots 1 2 &3 to City Standards. a)X Easements 5. (City utilities, private access, other utilities): X a) Provide all easements as required. X b) All lots shall access off private access road. X X c) Private access easement shall be 20 (twenty) feet in width. EngrReqtsPLN20080037_2.xls1 of 3 Required as a Preliminary Approval Required as a Requirement Condition of Condition of Already SFR Building SubdivisionSatisfied Permit 6.Street Lights: N/A Planting Strip: 7. N/A 8.Water System Improvements (City of Edmonds): Public hydrant spacing shall meet requirements of ECDC 19.25.X a) Provide water service stub to each Lot -- Water Service for Lots 2 and b) 3 shall be stubbed from the watermain within the City easement through the private access road to the east of the proposed X subdivision. Lot 1 shall be served via the existing water service on 220th St. X Connect to public water system. c)X 9.Sanitary Sewer System Improvements (OVWSD): Applicant must meet requirements set forth by Olympic View Water a) Sewer District for connection to public sewer system. X Provide new 6" lateral within access/utility easement and individual b) side sewers to each lot with 6" cleanout at each property line. X c)Connect shared service lateral to existing 6" OVWSD lateral at property line. X Connect to public sewer system. e X 10.Storm Sewer System Improvements: Provide a Stormwater Management report and plan. Compliance with a) ECDC 18.30 and 1992 Department of Ecology Stormwater Manual is X required. b)Construct privately owned and maintained storm detention system sized to provide adequate capacity for proposed future single family dwellings, associated impervious areas and street improvements in X accordance with ECDC 18.30. Storm detention system to be located on private property. X c)Connect all new impervious surfaces to detention system.X Provide storm sewer stub to all proposed lots. d)X e)Connect to public storm system. X X Underground Wiring (per Ord. 1387): 11. X Required for all new services. a)X 12.Excavation and Grading (per IBC) Submit a grading plan as part of engineered site plan. This plan shall a) X not include grading for building pads. EngrReqtsPLN20080037_2.xls2 of 3 Required as a Preliminary Approval Required as a Requirement Condition of Condition of Already SFR Building SubdivisionSatisfied Permit X Submit grading plan for building pads with building permit. b) 13.Signage (per City Engineer): Provide fire and aid address signage. a)X 14.Survey Monumentation (per Ord., Sect. 12.10.120): a)N/A 15.As-built Drawings(per City Engineer): Required for all street and utility improvements. Provide an electronic a) X X copy (.dwg format for the SP) and a hard copy to City. Other Requirements: 16. X Plat showing lots, easements, legals, survey information a)X i. Include on civils and recording documents the extent of the 88th Ave X W ROW vacated per Ordinance 3115. Legal documents for each lot b)X Field stake lot corners (by professional surveyor) c)X d)Field stake utility stubs at property lines X Clustered mailbox location per Postmaster e)X Maintenance agreements f)X Traffic Impact Analysis g)X 17.Engineering Fees: $451.00 a)Storm development charge (access tract)X X Storm system development charge$428.00 b) X Sewer connection fee OVWSD c) X Water connection fee$908.00 d) X Water meter fee - 3/4" meter $550.00 e) X Traffic mitigation fee per SFR$840.72 f) Short Plat review fee X $860.00 g) Inspection fee (2.2% of improvement costs)TBD g)X Edward SibrelJanuary 14, 2009 Engineering Technician Date EngrReqtsPLN20080037_2.xls3 of 3