Loading...
EOR Omit Oil-Water Tees.pdfNov 26 07 01:26p JRR Engineering Inc. 4256874506 p.2 JRR EngincBring, hie. 18609 76th Avenue West, Suite B Lynnwood, WA 980,37-4149 Phone- (425) 697-5108 Fax: (425) 697-45,06 November 26, 2007 Jeanie McConnell City Of Edmonds 121 — 5t' Ave N. Edmonds, WA 98026 SUBJECT Oil/Water Separator Tees Not Installed Per Plan, Bank of Washington, SW Comer of 5th Avenue South, Edmonds, JRR #06-67A REF: Permit #: 2006-0558 Dear Ms. McConnell: JRR Engineering, Inc, (JRR) understands the inlet and outlet tees were not installed in the oillwater separator per the approved plans for the above subject project. Since the baffles were installed and only 9.4 feet was needed for length of flow path (over 12 feet should exist within the detention vault) it is our opinion the control tee within the vault Is adequate And the tees witbin the separator may be omitted. Please advise if you have any questions or concerns regarding this matter. Sincerely, JRR Engineering, Inc. kRKrnt'o1I—JRRXLC-TTER54o667ALOi.doc