Erosion Control Corrections Ltr, 3-6-08.pdfMarch 6, 2008
Mike Arnim
PMA Development Corp.
19400 33r`' Ave W. Ste, 200
Lynnwood, WA 98036
RE: Erosion Control Corrections
Performance Bond for Short Plat 05-172
Dear Mr, Arnim,
I ani writing this letter regarding the results of the February 9, 2008 inspection of your short plat at
1 128 Viewland Way.
There are erosion control issues on the site that are hazardous and need to be corrected
immediately. Please contact the Engineering department by March 13, 2008 with your ,plans and
timeline to complete the work necessary.
1) Stabilize lower lot landscape.
2) Install permanent hillside stabilization.
The following are remaining issues that must be addressed before the performance bond can be
released: ,
1) Complete inside drop in side sewer manhole where lateral ties in,
2) Replace CB lid at NW corner of lower lot with vaned grate.
3) Redo asphalt patch in front of curb and gutter. Disintegrating in patches.
4) Replace damaged lower lot curb and gutter at curb cut.
5) Provide access to inspect lower lot drainage system.
6) Remove construction debris from lower lot.
7) Remove dirt and debris from street.
8) replace CB lid at NE corner of upper lot with vaned grate, complete thudding.
9) Unblock open drain line at NE corner of upper lot.
10) Provide copy of recorded short plat for City of Edmonds records.
Please call for a reinspection as soon as you have completed the requirements listed above. If you have
any questions regarding any of these requirements, please call either Ed Sibrel or myself at 425-771-
0220.
Sincerely;
JoAnne Zulauf
Engineer Technician