Loading...
EUC Forms.pdftl M bd W/ bCi E. ' • I 64 E U Edmonds Ufififics Conso & CUSTOMEk'�'- �EUC CONTACT Form A coordinated utility environment which maximizes joint utility opportunities to provide quality service for the citizens of Edmonds ........................................................................................................................................................................... YOU WILL BE GIVEN A CONFIRMATION NUMBER BY EACHUTILITY ONCE YOU HAVE INFORMED THEM OF YOUR PROJECT. SITE ADDRESS: 11'Z2 O 11avxo; C' AUK . rdv'10v1�5 r W4 CMW % PVC #�� Mary McAllister - 425-670-3216 You will need to provide PUD with a site plan and a completed New Service Questionnaire. P UG E T SOUND # See ENERGY New Customer Construction Call to verify gas availability and to coordinate service install. You will need to Department - 1-888-321-7779 provide parcel number, contact phone number and mailing address. #f-VPcicamc fier You will need to provide Frontier with the location of your project, total line Jeremy Fallt - 425.263-4024 requirement, and the date in which service is required. A copy of your • • # You will need to provide Comcast with the location of your project, a copy of Mike Fontenot 425-263-5482 your development and site plan (digital copy if available.) The date in which service is required and a list of contact names, phone numbers 6r mailing �y1AP i � r _\ # N �fA 6 SF1'rf fl US/ Steve Dunphy - 425.774-7769 ext. 110 You will need to provide OVWSD with the survey map of your site and For customers in Olympic View Service Area complete a development information form. THIS FORM MUST BE COMPLETED AND GIVEN TO DEVELOPMENT SERVICES STAFF AT THE TIME OF PERMIT SUBMITTAL Rev. 10/1/13 PUGET SOUND ENERGY September 19th 2017 Kayla Clark Re: 1122 Olympic Ave. Edmonds, WA 98020 To Whom It May Concern, Puget Sound Energy (PSE) will provide new gas service to the site noted above according to the terms and conditions of Gas Tariff Rule 7 on file with the Washington Utilities and Transportation Commission. Any easements needed to serve the parcel, extraordinary restoration, special permits, or conditions required by those permits are the sole responsibility of the owner in accordance with the same tariff listed above. Please allow at minimum 3 months for planning purposes. Thank You, Kevin Williams Customer & System Projects Puget Sound Energy 425-691-7573