EUC Forms.pdfC'
�1 EdmmdsUtiHesCo wfi m
CUSTOMER — EUC
CONTACT
Form
A coordinated utility environureni which uraxinrizes joins Wilily opporlunilies to provide quality service fir the citizens of Edmonds
YOU WILL BE GIVEN A CONFIRMATION NUMBER BY EACHUTILITY ONCE
YOU HAVE INFORMED THEM OF YOUR PROJECT.
SITE ADDRESS: _'W'
�iNU11UM1111 [�UUN 1 V
r '
(ill lit lf' IliII IIV I)I!.i u1C"1 NU 1
Matt' McAllister - 425.670-3216
P_UG E T
SOUND
ENERGY
New Customer Construction
Department - 1.888.321.7779
ftenfier
wntc .0 the Nave Frwlicr
Jeremy Fallt - 425.263.4024
Mike Fontenot 425-263.5482
AP�r v<!.
Steve Dunphy- 425-774-7769 ext. 110
For customers in Olympic View Sen"ice Area
# OOIX'l ' �,p 1� SFA ��•
p44A,,A . - 'f?0 >
You will need to provide PUD with a site plan and a completed New
Questionnaire.
#
Call to verify gas availability and to coordinate set -vice install. You will need to
provide parcel number, contact phone number and mailing address.
I
You will need to provide Frontier with the location of your project, total line
requirement, and the date in which service is required. A copy of your
# I (elgD22
You will need to provide Comcast with the location of your project, a copy of
your development and site plan (digital copy if available.) The date in which
.service is required and a list of contact names, phone numbers & mailing
# 0fPv
You will need to provide OVWSD with the survey Wrap of your site and
complete a development information form.
THIS FORM MUST BE COMPLETED AND GIVEN TO DEVELOPMENT
SERVICES STAFF AT THE TIME OF PERMIT SUBMITTAL Rev. 10/1/13
PUGET SOUND ENERGY
September 19to 2017�FA
T
18807 88tn Ave W
Edmonds, WA 98026
Re: 18807 88th Ave. W. Edmonds, WA 98026
To Whom It May Concern,
Puget Sound Energy (PSE) will provide new gas service to the site
noted above according to the terms and conditions of Gas Tariff Rule 7
on file with the Washington Utilities and Transportation Commission.
Any easements needed to serve the parcel, extraordinary restoration,
special permits, or conditions required by those permits are the sole
responsibility of the owner in accordance with the same tariff listed
above.
Please allow at minimum 3 months for planning.
Thank You,
Kevin Williams
Customer & System Projects
Puget Sound Energy
425-691-7573