Loading...
EUC_Form.pdfJ'Lli� Q';' [�iu F)E'V L0[-1r�3rE1-F SERMES E&on& Utilities Co�Mn CUSTOMER - EUC CONTACT Form A coordinated utility environment which maximizes joint utility opportunities to provide quality service for the citizens of Edmonds YOU WILL BE GIVEN A CONFIRMATION NUMBER BY EACHUTILITY ONCE YOU HAVE INFORMED THEM OF YOUR PROJECT. SITE ADDRESS: ZOOz� '6S ; `� A vE W `Z , Z-0-2 Mary McAllister - 425-670-3216 You will need to provide PUD with a site plan and a completed New Service Questionnaire. PUGET # SOUND ENERGY S V') j & V New Customer Construction Call to verify gas availability and to coordinate service install. You will need to Department - 1-888.321.7779 provide parcel number, contact phone number and mailing address. i� er ftA7'toc2Qmce qI( Now Frontier bo�J "lr�n,�1 You will need to provide Frontier with the location of your project, total line Temp-Fl - D 14 3 plot requirement, and the date in which service is required. A copy of your # 71t-j(z Z 1 "3 Mike Fontenot 425-'2'6�,5482 You will need to provide Comcast with the location of your project, a copy of your development and site plan (digital copy if available.) The date in which service is required and a list of contact names, phone numbers & mailing MP1c V#1i # , J - c,+i3 of 0 v\/QK-a s • ��,Q SEINEROSti• Steve Dunphy - 425.774.7769 ext. 110 You will need to provide OVWSD with the survey map of your site and For customers in Olympic View Service Area complete a development information form. THIS FORM MUST BE COMPLETED AND GIVEN TO DEVELOPMENT SERVICES STAFF AT THE TIME OF PERMIT SUBMITTAL Rev. 10/1/13 PUGET SOUND ENERGY Puget Sound Energy P.O. Box 97034 Bellevue, WA 98009-9734 PSE.com May 41h 2018 Eric Eric Haines, EIT 9740 Evergreen Way Everett, WA 98204 425-356-2700 x107 website: wesi.co To Whom It May Concern, Puget Sound Energy (PSE) will provide new gas service to 20020 83rd Ave W, Edmonds, Wa 98026, TaxAcct No. 00431200000201 according to the terms and conditions of Rule 6 and with the Washington Utilities and Transportation Commission. Any Easements needed to serve the parcel or special permits or conditions required by those permits are the sole responsibility of the owner in accordance with the same schedule and tariff listed above. Thank You, Jordan Cooper Associate Project Manager / Customer and System Projects ® PUGETSOUND ENERGY Cell: 425-623-5302 Jordan. Cooper@ pse.com PLEASE EMAIL REQUESTS PUG ET Maps & Records SOUND External Request Form Phone (425) 456-2511 ENERGY email: MapRequest@pse.com for forms and returning completed forms 355 110th Avenue NE, Bellevue WA 98004 Please allow 5 to 10 working days for delivery. Date 4/4/2018 Phone 425-356-2700 107 EXT. Agree to PSE' Security Agreement I YES I yes Utility Information Requested: Electric x Gas Contact Name Eric Haines Contact email: erich@wesi.co Agency/Firm Western Engineers & Surveyors, Inc. Address / Street 9740 Evergreen Way City, State, Zip Everett, WA 98204 Project Type: Public Improvement (Road Widening, Sidewalks, Utilities, Etc.) City, County, Township (Funded) x Private Development (New Construction, Residential, Commercial, Industrial, Short Plats, Etc.) Project Name: Evans Short Plat Project Location I Site Address: Please include cross street before and after requested address: 20020 83rd AveW, Edmonds. WA 98026 Approximately 150 feet south of the intersection of 200 Street SW and 83rd Avenue W Required: Project COUNTY - City & Zip Isnohomish JEdmonds 98026� County City Zip REQUIRED* 1/4 Sec(s) Township Range: can be found in The Thomas guide 1/4 Section NE 19 Township T27N Example 30 T29N Range R4E R5E If requesting more than one Quarter Section fill out attached sheet -- see page 2. Detail Protect Description (I.e. road widening with stormwater improvement: Residential Plat: etc.) Subdivision of property with retention of existing house on proposed Lot 2. Lot 1 to construct new residence with shared driveway, utility installation, and stormwater improvements. Please Select One Yes No Unknown FRONTAGE IMPROVEMENT IN RIGHT OF WAY x FEDERAL FUNDS INVOLVED IN THE PROJECT x UTILITIES RELOCATION REQUIRED FOR PROJECT? x NOTE: By identifying utilities early in the design phase costly relocations may be avoided or minimized. When you receive Puget Sound Energy facility maps you will also receive contact information to help and provide your costs if your project area is impacted by PSE natural gas and/or electril facilities. "IT'S THE LAW" - CALL TWO (2) BUSINESS DAYS BEFORE YOU DIG - 811 or 1.800.424.5555 or callbeforeyoudig.org form date 1/15/10