EWHS fields-Engineering Comments 2-bld20180708.pdfOF EDV0 CITY OF EDMONDS CIVIL PLAN REVIEW COMMENTS ENGINEERING DIVISION 6'st 1 g90 (425) 771-0220 City Website: www.edmondswa.gov DATE: December 7, 2018 TO: Nick Chou choun@edmonds.wednt.edu FROM: Jeanie McConnell, Engineering Program Manager jeanie.mcconnell@edmondswa.gov RE: Application #: bld20180708 Project: Edmonds Woodway Highschool Fields Project Address: 7600 212th St SW During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please submit revised plans/documents with a written response to each of the items below to a permit coordinator. Resubmittals can be made at the Development Services Department on the 2nd floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details and development code can be referenced on the City website. Comments 1 —July 24, 2018 Comments 2 — December 7, 2018 GENERAL 1. December 7, 2018 — Response letter states this item is Pending. 7/24/2018 comment - Provide an itemized engineers cost estimate for both on -site and off -site (right-of-way) improvements, including traffic control and all utility installations. Use the King County Bond Quantity Worksheet (available on the county website) and utilize "write-in" sections where appropriate. a. A 3.3% inspection fee is calculated for the project based on 100% of the City approved estimate for the entire project improvements. 2. ok 3. December 7, 2018 — City standard details provided on sheet F-2.13 were not updated. 7/24/2018 comment - City standard details have been updated and renumbered. Please refer to City website and reference and incorporate new details into plan set. 4. December 7, 2018 — Response letter states "Path of travel is indicated on Sheet F-1.1 Layout Plan. This comment does not seem applicable, however, the applicant has separately submitted documents to the City for review and any comments will follow these plan review comments. 7/24/2018 comment - As noted during design review, a right-of-way dedication will be required at the building permit phase of this project to clear up an existing right-of-way/parcel boundary discrepancy. Please provide a site plan, meeting Snohomish County recording requirements, that shows the specific dedication area. This will accompany the ROW dedication document. Once receiving the site plan, City staff will present the topic at a Council committee meeting. Following that meeting and approval at the committee level, the item will be placed on the council consent agenda. Recording of the dedication will take place following that. 5. December 7, 2018 — Response letter states this item is Pending. Please note, the City has not received a copy of the covenant for review. 7/24/2018 comment - A Stormwater Covenant is required to be recorded against the property based on the proposed stormwater facilities for the project. Please complete the attached covenant, including notarization and any required exhibits and submit to the city. The document must be complete, but will not be recorded prior to permit issuance. Prior to construction final, the location of facilities are to be verified (by field inspection and asbuilt) and then the covenant will be recorded. Sheet F-0.4 — TESC NOTES 1. December 7, 2018 — Standard details were replaced, however, there was a drafting error and portions of the details are missing. 7/24/2018 comment - Replace the following erosion control details with City standard details: CB protection, construction entrance, and filter fabric fence. Sheet F-0.5 — TESC NOTES 1. ok 2. Revise General Construction Notes as follows: Refer to sample on City website. a. 12/7/2018 — Note was not updated to reflect 2018 standard specs 7/24/2018 comment - Update Note 1 on the plan set to reflect 2018 standards b. ok c. ok d. ok Sheet F-1.1 - LAYOUT PLAN 1. ok 2. ok 3. ok 4. ok 5. December 7, 2018 — The Landscape Restoration hatching is difficult to read with the latest print of the plans. Please revise/address accordingly. STORMWATER ENGINEER REVIEW No further comments Page 2 of 2