Loading...
FIELD CHANGE RE_ Northpoint - Revised Parapet detail RFI-036.pdfFrom: Biorback. Leif To: "Douglas Mcnutt" Cc: Johns, Kristin; San ni u; Thompson, Milton; Carter, Eric Subject: RE: Northpoint - Revised Parapet detail RFI-036 Date: Thursday, October 25, 2018 5:19:23 PM Douglas, I reviewed this detail with both Milton and Eric. This particular level of additional detail can be treated in the field as a request for clarification, or RFI, and can be handled if the field, without formal plan review, by simply providing the inspector a stamped or letterhead copy of the RFI. I will add, in response to your earlier question, that changes to the approved plans involving more significant issues, such as relocating walls or rooms, changes to beam sizes or shearwalls, egress or accessibility, etc., would require a formal submittal as a revision, including plan review. The distinction between a clarification and a revision is normally determined by the building inspector. I hope this helps. Leif 3forba. Building Official City of Edmonds (425) 771-0220 Development Services Hours: Monday & Tuesday 8:00 AM — 4:30 PM WEDNESDAYS WALK-IN (counter) hours are 8:30-Noon Thursday & Friday 8:00 AM — 4:30 PM From: Douglas Mcnutt <douglas.mcnutt@salus.archi> Sent: Wednesday, October 24, 2018 5:59 PM To: Bjorback, Leif <Leif.Bjorback@edmondswa.gov> Cc: Johns, Kristin <Kristin.Johns@edmondswa.gov>; Sangni Qu <sangni.qu@salus.archi> Subject: FW: Northpoint - Revised Parapet detail RFI-036 City of Edmonds, Development Services Department 121 5th Ave N Edmonds, WA 98020 NorthPoint Recovery, Remodel of Edmonds Facility Request for revisions to Parapet Detail Permit #BLD2018-0447 To Leif Bjorback and Kristin Johns, Milton Turner met with Greg Shelton (Venture Construction) to review the parapet. Milton reviewed the new parapet detail 10/S-582 (for the east/west sides) and felt we should review it with you. The new detail is for fastening the parapet to the existing 2x12 roof framing at the east/west sides. ABKJ Structural Engineers have stamped and signed this detail The original permitted detail 5/S581 was designed for fastening the parapet to the existing glu-lam beams. We are in construction and would appreciate your prompt review of this added detail. We are trying to get the roof on before the rains begin. Original Detail 5/5-581 that is part of the permit set: The permitted set of drawings show detail 5/S-581 (below) to be used on the north/south/east/west sides of the parapet. However, this detail which spans a 6x8 between glu-lams should only be used on the north/south sides of the parapet. There are no glu-lams on the east/west sides of the parapet. 2x8 @ 24" OC PARAPET WALL 112" PLWD ES ST18 @ EA END OF 6x8 (E) GL B I The 6x8 spans between the glu-lam beams on the north south sides of the parapet The glu-lam roof beams are in the northisouth direction only and do not extend on the east/west ends of the parapet. SPANNING BTWN (E) GL BMS TOP OF PARAPET EL PER ARCH DWGS� L5x5x3/16 x 0-9 W/ 4- 5/16" x 0-3 LAG SCREWS @ 3" OC & MIN 1" EDGE DIST AT EACH 6x6 END, AND W/ 2 - 3/8" x 0-4 LAG SCREWS @ 3" OC & MIN 1 1/2" EDGE DIST AT (E) GL BM (E) 1/2- PLWD DECK , TYPICAL PARAPET SECTION No SCALE At North,South parapets New Detail 10/S-582 the East/West sides of the para eft. The east/west sides of the roof are framed with 2x12's rather than glu-lams. Detail 10/S-582 was added to accommodate the east/west sides of the parapet. This detail places a 2x6 over the existing framing and fastens directly to the 2x12's. See detail below. ABKJ Structural Engineers have stamped and signed this detail 2-24 @ 24.00 PARAPET WALL PLWD (E) 2x12 The 2x6 plate fastens to the 2x12's foists at the eastwest sides of the parapet 2-SIMPSON SD9212 @ 24.00 @ (E) OUTRIGGER TOP OF PARAPET EL PER ARCH OWGS� 2x6 SILL PLATE SIMPSON GA1 @ 24.00 @ (E) OUTRIGGER 2-SIMPSON SD9112 @ EACH GAII (E) 1/2- PLWD DECK DBL 2x12 TYPICAL PARAPET SECTION @ �10 &WEST ENDS NO SCALE 0 Douglas McNutt Principal 1402 Third Avenue, Suite 200 Seattle WA 98101 Cell: 206 605-5597 Direct: 206 957-1906 Office: 206 652-0722 Fax: 206 652-0720 Email: doualas.mcnutt(a�salus.archi Web: wwwsalus.archi 0! SALUS ;0;•i;E ARCHITECTURE ABKJ1 .. .XAfi • JAGOLS 1 An . WO A VEtA.E. WR 200 SEATTLI. WAS) 10141 "101 @ 24- 1Et- W63AD2 s FAX* 2063422" EAST-) U 00