Field report 1.pdfROSENAU & ASSOCIATES INC. CO-P)( OTTO ��� Geotechnical Engineering, Construction Inspection & Materials Testing CONSTRUCTION INSPECTION REPORT RES U B Report Number: 367913 MAY 3 1 2011 BUILDING DEPARTMENT Project: Margo Day Residence Permit Number: (In progress) CITY OF EDMONDS Address: 219 Skyline Drive, Edmonds Job Number: 18-0269 r•11nn+ nArlrmwe- al T i Naw Market Street. Suite 105. Bellingham U 11U1 IL. Mull l0 vi- Inspections Performed - Steel Decking Other (specify): Soil bearing X Other (specify): J Structural Steel Fabrication Structural Steel Erection Inspector anri nme Remarks Chris Smith Contractor requested a site visit to inspect soil bear capacity. ORA representative soil probed 4 spread 4/11/2018 footings and one continuous footing at the south west comer of the property. A representative number of probe tests were taken throughout the referenced vicinity; based on penetration of 2" to 3" with sustainable resistance to advance into surface it is our recommendation that the top T' to 2" of soil be removed before placement of concrete to reach competent soils that can support 1,500 psf. Conforms Note from office: After discussion with Corry Morris with Morris Original, LLC and Chris Smith with Otto Rosenau; After removal of the top 1" — 2" of soft soils, in our opinion, the underlining material was capable of supporting 2,000 psf. Copies to: X Client X Engineer Others Owner Contractor Technical Responsibility: Architect X Building Dept. -C-- Isaac Ruoff, Project Manager This report applies only to the items tested or reported and is the exclusive property of Otto Rosenau & Associates, Inc. Reproduction of this report, except in full, without written permission from our firm Is strictly prohibited, Page 1 of 1 6747 M.L. King Way S., Seattle, Washington 98118 — Phone (206) 725-4600 or 1-888-OTTO-4-US — Fax (206) 723-2221 Form No.: ADMIN-63-05 (Rev 10/10)