Field Report from Earth Solutions NW dated 2-26-19 (2).pdfEarth Solutions NW«c
GFdIB
S0111,11HORIS
1805 136'^ Place NE, FAX:
Time On Site
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
1:30
(425)449-4704 (866)366-8710
DAILY FIELD REPORT
Travel Time
1.25 hours
Project Name
Select Homes, 88th
General Contractor
Complete Excavations
Grading Contractor
Job Location
18807 _ 88th Ave. W, Edmonds
General Contractor's Superintendent
Grading Foreman
tAxh?Al% 0335—
Project No.
Page of
Report No.
5263.03
1 /1
1
Time Off Site
Date
Day of Week
11:45
2/26/19
Tues.
Weather
Sunny, 35°F
Client / Owner
_ Select Homes, Inc.
Received Onsite By
Checked By
(* 3f11r
Are approved Plans/Permits onsite
FIYES ❑ NO
Project No.
Permit No.
Test
Reference
Maximum
Fill
Test Dry
% of
Number
Test Location
Elevation
Compaction
Dry Density
Moisture
Density
Maximum
Curve
lbs./cu.ft,
%
lbs./cu.ft.
Dry Density
1
In -road utility
trench
SPH
8.20
123.6
95
1
130.1
-
2
In -road utility
trench
_
7.42
125.4
96
As requested by the contractor, ESNW rep. was onsite to observe and test backfill in a utility trench across 881" Ave
Utility trench observations:
Upon arrival, ESNW rep. observed the contractor working in the road backfilling a shallow utility trench. ESNW rep.
observed that the contractors had embedded the pipes in sand and then backfilled over them in —12" lifts of imported
5/8" minus crushed rock. ESNW rep. observed the contractor using a small jumping jack to compact the backfill
material in between lifts. ESNW rep. took compaction tests in the backfill at the -2' and SG elevations.
Compaction Testing:
ESNW rep. took compaction tests at approx. the -2' and SG elevations within the trench backfill. Density test results
indicate adequate compaction of at least 95% at the tested locations.
ESNW rep. is available to return upon request from the contractor.
Greg Buzitis
ESNW Field Technician
(206) 488-4151