Field report Special insp (2).pdf- ��aram► 1,an& ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION April 30, 2019 KA No. 096-18208 Permit: BLD2017-0629 MAY 0 6 2019 r Mr. John Murphy (E-Mail) 6'jg - "j E211VO D1V1f0g�9 MURPHY BUILDING COMPANY, INC. 6203 202"d Street SW Lynnwood, WA 98036 RE: CONSTRUCTION TESTING AND INSPECTION O'Neal SFR 15716 72°d Avenue W Edmonds, Washington Dear Mr. Murphy, In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, N & ASSOCIATES, INC. . Mercer Project Manager/Lab Manager Pacific Northwest Division CWWIkj CCCITY OF EDMONDS 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618208 DFR doc W.lraZal &ASSOCIATES GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION FORENSIC INVESTIGATION Date: Project No.: Proj ect: Project Location: Krazan PM: Report No.: April 26, 2019 Contractor: 096-18208 Permit No.: O'Neal SFR Inspector: 15716 — 72"d Ave W, Jurisdiction: Edmonds, WA CM Weather: FIELD REPORT 09618208DFRO42619JL Murphy Building Co. Jeff League City of Edmonds Mostly Sunny Temp: 55-600 F A Krazan geotechnical representative visited the site today to observe rockery construction. Rockery Construction A contractor was constructing a rockery in the northeastern portion of the property. The bottom row of rocks had been placed in the western portion of the rockery alignment, and a drainage system was being installed behind the rockery face. The drainage system generally consisted of a 6-inch diameter perforated PVC pipe surrounded by washed drain rock and filter fabric. The fabric was also placed along the back of the rockery cut. We were informed that the drain pipe was connected to an existing catch basin at the western end of the rockery. It is our understanding that the City of Edmonds has requested an inspection of rockery construction, including rockery height, subgrade materials, and rock size (per City of Edmonds Standard Rockery Detail, drawing number E8.9, dated 9/9/05). Rockery Height: We were informed that the rockery will be approximately 3 to 4 feet in height. The eastern end of the rockery will be two -tiered, including a horizontal bench and short second -tier rockery. Subgrade Materials: Subgrade soils consisted of brown sand and silty sand with gravel. We evaluated the subgrade soils in the rockery alignment and in front of the already -placed rocks using a 1/2-inch diameter steel T-probe. The soils were probed approximately 1 to 3 inches, indicating medium dense to dense conditions. Rock Size: We measured the bottom rock size in the western portion of the rockery. The rocks were approximately 3 to 4 feet long parallel to the rockery alignment, and about 2 to 3 feet wide perpendicular to the rockery alignment. This field report is for informational purposes only. Superintende I epre ntative: Technician: Jeff League 4303 —198" Street SW • Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618208 DFR042619JL.doc KRAZAN & ASSOCIATES, INC. Site Plan (Not to Scale) 09618208DFRO42619JL O'Neal SFR Edmonds, WA April 26, 2019 Page No. 2 Pat- -ty t�ll k Im Ftle- 0 9c -- I Z--9 Y1Z-.C1f,r This field report is for infonnational purposes only. Superintend ep sentative: Technician: Jeff League Krazan & Associates, Inc. Offices Serving The Western United States