RE: CONSTRUCTION TESTING AND INSPECTION
O'Neal SFR
15716 72°d Avenue W
Edmonds, Washington
Dear Mr. Murphy,
In accordance with your request and authorization, our firm performed construction testing and inspection
for the above -referenced project. The sampling and testing was performed by our inspectors and reports
are included.
If you have any questions, or if we can be of further assistance, please do not hesitate to contact our
office.
Respectfully submitted,
N
& ASSOCIATES, INC.
. Mercer
Project Manager/Lab Manager
Pacific Northwest Division
CWWIkj
CCCITY OF EDMONDS
4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837
With Offices Serving the Western United States
09618208 DFR doc
W.lraZal &ASSOCIATES
GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING
CONSTRUCTION TESTING & INSPECTION
FORENSIC INVESTIGATION
Date:
Project No.:
Proj ect:
Project Location:
Krazan PM:
Report No.:
April 26, 2019
Contractor:
096-18208
Permit No.:
O'Neal SFR
Inspector:
15716 — 72"d Ave W,
Jurisdiction:
Edmonds, WA
CM
Weather:
FIELD REPORT
09618208DFRO42619JL
Murphy Building Co.
Jeff League
City of Edmonds
Mostly Sunny Temp: 55-600 F
A Krazan geotechnical representative visited the site today to observe rockery construction.
Rockery Construction
A contractor was constructing a rockery in the northeastern portion of the property. The bottom row of rocks
had been placed in the western portion of the rockery alignment, and a drainage system was being installed
behind the rockery face.
The drainage system generally consisted of a 6-inch diameter perforated PVC pipe surrounded by washed
drain rock and filter fabric. The fabric was also placed along the back of the rockery cut. We were informed
that the drain pipe was connected to an existing catch basin at the western end of the rockery.
It is our understanding that the City of Edmonds has requested an inspection of rockery construction, including
rockery height, subgrade materials, and rock size (per City of Edmonds Standard Rockery Detail, drawing
number E8.9, dated 9/9/05).
Rockery Height: We were informed that the rockery will be approximately 3 to 4 feet in height. The eastern
end of the rockery will be two -tiered, including a horizontal bench and short second -tier rockery.
Subgrade Materials: Subgrade soils consisted of brown sand and silty sand with gravel. We evaluated the
subgrade soils in the rockery alignment and in front of the already -placed rocks using a 1/2-inch diameter steel
T-probe. The soils were probed approximately 1 to 3 inches, indicating medium dense to dense conditions.
Rock Size: We measured the bottom rock size in the western portion of the rockery. The rocks were
approximately 3 to 4 feet long parallel to the rockery alignment, and about 2 to 3 feet wide perpendicular to the
rockery alignment.
This field report is for informational purposes only.
Superintende I epre ntative: Technician: Jeff League
4303 —198" Street SW • Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837
With Offices Serving the Western United States
09618208 DFR042619JL.doc
KRAZAN & ASSOCIATES, INC.
Site Plan
(Not to Scale)
09618208DFRO42619JL
O'Neal SFR
Edmonds, WA
April 26, 2019
Page No. 2
Pat- -ty
t�ll k
Im
Ftle-
0 9c -- I Z--9
Y1Z-.C1f,r
This field report is for infonnational purposes only.
Superintend ep sentative: Technician: Jeff League
Krazan & Associates, Inc.