Loading...
Field report special insp.pdfT_i GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION May 1, 2019 Ms. Helene Behar (E-Mail) BEHAR COMPANY 1000 2nd Avenue, Suite 3230 Seattle, WA 98104 RE: COMPRESSIVE STRENGTH TEST RESULTS Edmonds Village Exterior Renovation 22019 Hwy 99 Edmonds, Washington Dear Ms. Behar, KA No. 096-18122 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. yman L. Mercer Project Manager Pacific Northwest Division RLM/lkj CC: CIIY OF EDMONDS' WARE MALCOMIi ARCHITECTURE (E-MAIL) CG ENGINEERING (E-MAIL 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618122 BRK =- Krazai—i&Associates. Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection DATE: 4/22/2019 PROJECT #: 09618122 PROJECT: Edmonds Village Exterior Renovation LOCATION: 22019 Hwy 99 IW P.M.: Ryman Mercer Field Data Concrete: 3200 Other: CONCRETE REPORT NO.: 09619122CR042219,tA CONTRACTOR: Wilcox Construction PERMIT #: BLD2017-1452 INSPECTOR: Joseph Aranas JURISDICTION: City of Edmonds WEATHER: Shower TEMP: 47 ° Supplier: CALPORTLAND Plant No. 1 260 1 Site Mix. Slump Mix Air Unit Time Truck# Ticket# %Air Inch Temp(F) Temp(F) Weight 8:20 1 7426 1 2080828 1 5 1 60 ° 1 47 ° Location: Placement Area Slab On Grade grid line @ 1-4/A-B,4-4.2/A-B, Stem wall Footing grid line @ B.5-B.8/4-4.1 and Footing grid line @ 2/D Remarks: Place in a pump and boom. Mechanically Consolidated. Please Refer To Field Repot Number: 09618122DFR4222019JA Inspector: Joseph Aranas Reported Batch DATA Cement Type I/II Design Actual Mix No 3200 3200 celn Lbs 517 516 F Ash lbs C Agg Lbs AGG571850 1851 C Agg I.os C Agg Lbs Sand It,, 1450 1451 Wale( 261 261 l dmature Admixlu' Admrxlur° Air Ent (oz/cm ) Water Added On Job Site (Gals) 20 Field Test ASTM Method C172 C143 C138 C1064 C231 C31 Other Laboratory Data Design Strength: 3000 @ 28 days Date Specimens Rec'd: 1 4/23/2019 Cyl. Code Test Date Field Cure Age Dia. Area Wt. # Max Load Comp. Strength Set # Tested By Brk Typ Test Method ASTM C39 66470-1 4/29/19 7 4.00 12.57 58510 4650 1 BAW 2 ASTM C109 66470-2 5/20/19 28 ASTM C617 66470-3 5/20/19 28 ASTM C1231 66470-4 5/20/19 1 28 ASTM C1019 66470-5 H OTHER Test Results Remarks: Results Reviewed By. Date: Codes for Break Types: 'I 1 j� 2 3 4 5 6 Offices Serving The Western United States Concrete Report Effective 02/22/2018 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The Information provided on Bite report is prepared for the exduelve uas of the oilers, "my nol be reproduced In any formal without the -ixen permlaslon al the diem and Kremn 8 Associates This raporl Indicates our Inspector', obearMbn and feeling results based on else conddNerw arM cerllwdor edNiliw This Information Is eubtecl to review prior to fowl submittal By dgrgng Ihls repal, our Inepaelor does nd accept rmpme4Wllty for vallddy of resuKa The mme Infomwsbn has been pm/ged by oaww m else