Loading...
Field report Special insp.pdf& ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION May 1, 2019 KA No. 096-18208 Permit: BLD2017-0629 MAY 0 6 2919 Mr. John Murphy (E-Mail) MURPHY BUILDING COMPANY, INC. 6203 202"d Street SW Lynnwood, WA 98036 RE: CONSTRUCTION TESTING AND INSPECTION O'Neal SFR 15716 72"d Avenue W Edmonds, Washington Dear Mr. Murphy, In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do riot hesitate to contact our office. Respectfully submitted, AN & ASSOCIATES, INC. ett . Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/lkj CC: CITY OF EDMONDS 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618208 DFR doc -�KraZan &ASSOCIATES GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION FORENSIC INVESTIGATION FIELD REPORT Report No.: 09618208DFRO42919JL Date: April 29, 2019 Contractor: Murphy Building Co. Project No.: 096-18208 Permit No.: Project: O'Neal SFR Inspector: Jeff League Project Location: 15716 — 72nd Ave W, Jurisdiction: City of Edmonds Edmonds, WA Krazan PM: CM Weather: Sunny Temp: 600 F A Krazan geotechnical representative visited the site today to observe rockery construction. Rockery Construction The contractor had completed most of the rockery in the northeastern portion of the property. The western portion of the project was under construction. It is our understanding that the City of Edmonds has requested an inspection of rockery construction, including rockery height, subgrade materials, and rock size (per City of Edmonds Standard Rockery Detail, drawing number E8.9, dated 9/9/05). Construction generally consisted of rocks approximately 3- to 4-feet in size, and the rockery height was about 4 feet. A short two -tiered rockery was constructed near the northeastern corner of the property. Quarry spalls had been placed behind the rock face. We evaluated subgrade soils in the western rockery alignment using a '/2-inch diameter T-probe. The soils were probed about 2 to 4 inches under moderate pressure, indicating medium dense conditions. We were informed that the western portion of the rockery along the northern property boundary is nearing completion. This field report is for informational purposes only. Superintendent/R r sen ative: Technician: Jeff League 4303 —19811 Street SW • Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618208DFRO42919JL doe KRAZAN & ASSOCIATES, INC. Site Plan (Not to Scale) PI -t" Vr-w l 066an. `4.46t4w \ KMire 0Y4. - /8 Las' Vi-ple 9 This field report is for informational purposes only. S ve: Ads Technician: Jeff League 09618208DFRO42919JL O'Neal SFR Edmonds, WA April 29, 2019 Page No. 2 Krazan & Associates, Inc. Offices Serving The Western United States