Field report.pdf{ tLD 20 r` O.2 2- NELSON GEOTECMWCAL ASSOCIATES, INC FIELD REPORT Project: Cascadian Apartments Underpinning File No: 9879B17 Client: Location: 17311 - 135'h Ave. NE #A-500 Weather: Woodinville, WA 98072 Purpose of (425) 486-1669 FAX 481-2510 Visit: Jeff and Lisa Sterling Date: 6/1/2018 9405 Edmonds Way Report No: 18 Partly Cloudy, 60's Page 1 of 2 Construction Monitoring By: EAF We visited the site today at the request of Jeff Sterling to observe construction activities at the site. Upon arrival to the site, we met with the contractors Winston and James to discuss the daily plans. We were informed that they planned to install an additional 9 pin piles today. The pin piles consisted of 2-inch diameter, schedule 80, galvanized steel, which were cut into 5.3-foot lengths and connected with steel internal slip couplers. We monitored as the pin piles were driven with a 140-pound pneumatic post -driver to a refusal criterion of one inch or less of vertical movement in sixty seconds of continuous driving. Pin piles observed to be installed today were driven to a complete stop or at least one inch or less of vertical movement in 60 seconds of continuous driving. The depths to refusal and corresponding pile numbers are listed in the table below. The depths are measured from the top of the foundation footing where present. The piles driven observed installed today appear to have been suitably installed and should support the planned loads. Pin Pile ID 1 Embedment Depth (ft) E F G_ H 12.4 13.4 12.4 8.1 1 9.6 1 { 13.4 K I 10.6 114--- LL M 12.4 — We have been providing monitoring of pile installation on a full-time basis. Our findings and conclusions are based on specific observations made while on site. We will continue to monitor the installation of underpinning at the site. Attachment: Site Plan Distribution: Signed: i % Srr-ti PLAN GA-Tt,: PFA Room EKIST CONC PATIO IIaoKAN010N.Ge I lr-r 11w swarweoeMalr =Alwalm Fro- CCWSLAI V'gA&CNGRACt -W VEAWYAItOVVX FOOTWO Q"K FEM M OCTAL WS&L FOM TO AIMPROPIVATE MCKAJIGE SMIM %I PO4MANDREPME 02ST COM == F-- F-- 3 *61 su 4 C-0 4-,, AW W0 Ir-Ir 1'r C.1 P, P-1 1A it* 3— Ilk V c & :k•4. A % CielcGrsrrea -it LLT�\ C9 vPvca jr4r GXWX PLUMMNG WALL r: r7 NELSON GEOTECHNICAL ASSOCIATES, INC 17311 - 135h Ave. NE #A-500 FIELD REPORT Project: Client: Location: Weather: Woodinville, WA 98072 Purpose of (425) 486-1669 FAX 481-2510 Visit: Cascadian Apartments Underpinning File No: 9879B17 Jeff and Lisa Sterling 9405 Edmonds Way Partly Cloudy, 530F Construction Monitoring Date: 6/12/2018 Report No: 19 Page 1 of 2 We visited the site today at the request of Jeff Sterling to observe construction activities at the site. Upon arrival to the site, we met with Jeff Sterling. We were informed that the majority of the interior slab -on - grade had been removed from the common areas and the underlying soils had been exposed. The subgrade was compacted with a jumping jack compactor. We evaluated the proposed slab subgrade with a 0.5 inch diameter steel probe under moderate pressure. Probying yielded penetrations of approximately 2 to 4-inches indicating medium dense conditions. In our opinion, the slab subgrade within the common room are appears to have been suitably prepared and is ready for placement of the rock base for the slab. We also observed that the remaining backfill within the interior of Unit 102. The excavations were backfilled with 5/8-inch crushed rock compacted with a jumping jack. Probing of the backfill within these areas yielded penetrations of approximately 1 to 2 inches under moderate pressure indicating well compacted conditions. In our opinion, the backfill observed today appears to have been suitably compacted and should support the planned loads. Our findings and conclusions are based on specific observations made while on site. Attachment: Site Plan Distribution: Signed: /�U /. Off -to *Am, �F-'-' 0 VEllit/E011 — • -+- VIM TODET IHAWSWEM jl'•a.l . — — --- t °. ! ••� 40, S IfFiPflDI I E6SI5BNEPE 71FTAH• (', I , ` �� , .. I ,•i a •. a' •� 1' b� 00 I I f r— r I• • .• ' J5.1l.00 •'a !S!!' OCYZP lS r�`bCg • 1 /. ..o • a 1. ., 7 is 1 . •O• � .I I� • a �• a I tL � � I �y i 1 a' t • •t J ,a a 1�1 :1 .' I .i� �a •' I 1•; . I. 1 I �•t• I .. •i � � •• I ® i + • a '� '} is . � .�i.� 1�,, � • � tr i� n � I I • • • II I r I• ♦may, .� � 1 . I ujI_ ii 't ITS �• a I • J �• ® 4'4• r� EWrM I Cascadian Apartments Underpinning NGA File No. 9879B17 FR# 1 pg: L/(p/IL201%Note: Not to scale, all drawin9s areaPProzi ate