Field Report.pdfi
r
Battermann
Ge c)terchnicaI
Consultirrt.,
i
ru"u��i%�i/ c%lir'rG7rl7/i!(lei„r�i�.�.!✓.v,�7�cr1i
FIELD REPOR,r
BGC, 6Dj_I_C;
14267 2091” Avenue NE
Woodinville, WA 98077
(425) 273-5062
10: hos. V`alclitin Sllvarova
_- ...._._ _ ....._,._ ..... ........---- — —....m...._ ..._...
9224 24011' 4treei ti\\'
1 clrlrond , WA 98020
............
A.¶ TN
AS REQUEs,rED Y: David DI N)el_..._..._.
11111 I'(71.1.OWIN(J WAS NOTED:
`i'hc unclersigacd was onsite today to evaluate the work performed to remove the shed and clexcle. that lead hcen.
built on the neighboring property at the sub.imt project. location. X111 of the structural elements that were to be
reproved had been rre,rnoved fror:n the site and (lie; n[;lg17borhi,,, property. The c;srlire area bad becla covered with
imported topsoil.. Girass seed is schcdulcc�l to be applied tater toclay or ton°rorrow. The new grass seed should be,
kept moist but tie( be; overs-walere,d cis we do nott want to erode; [lie nem topsoil.
No erosion or oft'site soil t.ranspor1occurred during the cicn-nolition o1 the structures. Tlic, work perl'or.rrrccl has
not irnpacte,d [lie existing stability of (lie sJopc. Pr°o6ded that. the grass, grov✓th bccorncr , established in tlrc.n next
couple months, the slope will he, stabilized. l "the grass ha., not becorne well cstarlrhshed by midOctober,
consideration should be given to covering l.lic slol:re with plastic s, iec.,ting or strain mulch to protect the new seed.
and topsoil -mons erosion over the, winte r.
All work was performed in accorclanc.e wills our gco(ce,hnicat a reconyrrrr,eadat�ions lett.csr i'crr [lie pro eo,, dated
March 26, 2014
B "',, E ,.
UG I 1 201
i:,0t..➢ l..t, R
y �r
r
61
API
Observed by: Jalpf, SBaC6—jnann, t".F-
Ylige t of
.v
�3�rYe Punct f Na we
�m
Project No.
8-5-1 Ej. rr uv `�hEdlDt c 1`.
14()013
—7—K,1ry
Lovalion
tVitafher
924 �4Gry w'}" tit "J ree6. S
Municipality,"
BldP. Permit No.
;
Edmonds
ID,irp,ures�r/Arefritc
— _.....__ ......
Ir:hr.aaklilawm.r
...._.._.__—
._._ _ _..._.. ..................___._.__._........_._.___.._.._.__�__....m........�,-
6,t rrcr al is mtl� ac.Yrn'/^i kr Pe.nrrfendvuf
A.Ccmalc and Affordable 1 emol.itlol9
Grading(.`o❑&r:pc.Cgrl;�irperinkendc�tt
`i'hc unclersigacd was onsite today to evaluate the work performed to remove the shed and clexcle. that lead hcen.
built on the neighboring property at the sub.imt project. location. X111 of the structural elements that were to be
reproved had been rre,rnoved fror:n the site and (lie; n[;lg17borhi,,, property. The c;srlire area bad becla covered with
imported topsoil.. Girass seed is schcdulcc�l to be applied tater toclay or ton°rorrow. The new grass seed should be,
kept moist but tie( be; overs-walere,d cis we do nott want to erode; [lie nem topsoil.
No erosion or oft'site soil t.ranspor1occurred during the cicn-nolition o1 the structures. Tlic, work perl'or.rrrccl has
not irnpacte,d [lie existing stability of (lie sJopc. Pr°o6ded that. the grass, grov✓th bccorncr , established in tlrc.n next
couple months, the slope will he, stabilized. l "the grass ha., not becorne well cstarlrhshed by midOctober,
consideration should be given to covering l.lic slol:re with plastic s, iec.,ting or strain mulch to protect the new seed.
and topsoil -mons erosion over the, winte r.
All work was performed in accorclanc.e wills our gco(ce,hnicat a reconyrrrr,eadat�ions lett.csr i'crr [lie pro eo,, dated
March 26, 2014
B "',, E ,.
UG I 1 201
i:,0t..➢ l..t, R
y �r
r
61
API
Observed by: Jalpf, SBaC6—jnann, t".F-