Loading...
Field report.pdfri�L9'btv- i VO Field Rep. Project No. Page of Report No. Earth Solutions NW«C 80111 HTW 5264.02 1 of 1 1 PI NE, Bellevue, WA 98005 Day of Week Time On Site Time Off Site Date Suite201 Suite 44 FAX (425) 449-4711 (866) 366-8710 9:45 3/19/19 Tuesday TOO6L--...mw FREE:04 TOLL FREE: Travel Time Weather DAILY FIELD REPORT 1.0 Sunny Client / Owner Project Name Job Location 1122 Viewland Way 1 1122 Viewland Way, Edmonds Select Homes, Inc. General Contractor I General Contractor's Superintendent Grading Foreman _ Received Onsite By Grading Contractor Checked By Are Approved Plans/Permits Onsite ® YES ❑ NO Project No. Permit No. As requested, ESNW representative was on site to observe building subgrade and excavation conditions for the west lot. The majority of the building excavation for the west lot had been completed prior to ESNW representative arrival. The excavation is stepped with the upper area consisting of the garage slab and crawl space, the lower portion will be building slab. The upper few feet of the soil conditions were observed to be variable, loose, and wet fill and disturbed native soil. The contractor had overexcavated the lower building pad area to expose competent native soil and will place 2-inch rock to bring back up to design elevations. ESNW representative recommended to bench cut the east side of the excavation where the upper loose soil is exposed. ESNW representative also recommended to overexcavate about one foot in the upper garage slab area, and about two feet in the upper footing subgrade areas and replace with crushed rock; the use of a geotextile fabric was also recommended prior to placing rock if the exposed native soil is loose. ESNW will return if requested. Henry .Wright, P.E. Senior Project Manager COPY TO: CONTINUED ON NEXT PAGE