Field report (2).pdf- iLD XG1!8 0 1 a I
NASH &ASSOCIATES GARY NASH
MARIE ANDERSON
A R C f1 I T 1_ C. T S MICHAELJOHNSON
City of Edmonds Building Department
Select Homes
Plan 2894
Keller Short Plat
Lot 2
At the den foundation wall that is a P1-3" shear wall where one 2-5/8" anchor bolt
was installed but the rest of the anchor bolts installed were 3/4" anchor bolts, no
additional engineering is required.
Gary Nash
Nash and Associates Architects
REOIS
ARC
G HOMAS NASH
STATE OF WASHINGTON
8003 118"' Avenue NE • Kirkland, Washington • 98033 •425-828-4117
www.Nash-Architects.com