Loading...
Field Structural Eng report.pdf'-IgLI-D tic) A pp— . I . A -a PROJECT MEMORANDUM Date. 01 October 2018 To: City of Edmonds Fr. Victor Martinez, P.E. I.L. Gross Structural Engineers, LLC Re: 510 Forsyth Unit 310 I.L. GROSS STRUCTURAL ENGINEERS ;N This letter is in regards to the construction observation of the remodel in the above mentioned unit. We have provided plans and details dated July 2018 showing the required framing at the removal of existing walls. OBSERVATIONS We observed the existing conditions above the existing wall as shown in detail SK-1. There appears to be two existing joists/beams directly above the top plate of the wall that has been removed. The additional sistering or blocking shown in SK-1 is not required. The connection hardware shown in SK-2 (Simpson A35 & LTP4) may be substituted with similar gauge metal connectors located as shown that fit within the wall. (2) Simpson H2.5A ties may be placed at either end of the 6x10 beam in lieu of the ACE connectors shown in the framing plan. 23914 56'h Ave W. - Suite # 200 Mountlake Terrace, WA 98043 Ph. (206) 623-0769 • (425) 640-7333