Loading...
Field_Report_08.05.14.pdf9224 2401h Street SW Edmonds, WA 98020 â–ºrare AS REQUESTED BY. David "l'HE I=OLLOWING WAS NOTED; 17, Page I of date 8-5-14 Project 3Vume Shvarova Shed(Deck Project No. 14008 Lvvmtion 9224 240" Street SW 'S MAher Sunny Municipality Edmonds 13idg, Permit No. Engi ncerlArchitect ClicntlOwner General ContnactorlSuperintendcnt Accurate and Affordable Demolition Grading Contractor/Superintendent The undersigned was onsite today to evaluate the work performed to remove the shed and deck that had been built on the neighboring property at the subject project location. All of the structural elements that were to be removed had been removed from the site and the neighboring property. The eritire area had been covered with imported topsoil. Grass seed is scheduled to be applied later today or tomorrow. The new grass seed should be kept moist but not be over -watered as we do not want to erode the new topsoil. No erosion or off site soil transport occurred during the demolition of the structures. The work performed has not impacted the existing stability of the slope. Provided that the grass growth becomes established in the next couple months, the slope will be stabilized. If the grass has not become well established by raid -October, consideration should be given to covering the slope with plastic sheeting or straw mulch to protect the new seed and topsoil from erosion over the winter. All work was performed in accordance with our geotechnical recommendations letter for the project dated. March 26, 2014. Observed by:.Ia y S. Ba ermann, P.E.