Loading...
Final Geotech-616 Glen-030810.pdfMar 11 10 04:05p D. Bruce, P.E. 2065468442 p.1 Dennis M. Bruce, P.E. M.S.C.E., M.B.A. March 8, 2010 City of Edmonds Development Services Division 121 Fifth Avenue North Edmonds, WA 98020 Subject: Final Report - Geotechnical Inspections 618 Glen Street Michel Construction Multi -Unit Project Permit No. 2006-0955 Geotechnical/Civil Engineer This engineering report presents the final results of geotechnical inspections for the multi -unit Michel Construction project at 618 Glen Street. These inspections were required as a condition of permit by the City of Edmonds Testing Agreement dated February 7, 2007. REFERENCES: • City of Edmonds approved project plans • Geotechnical and Inspection Reports by D. Bruce, P.E. • Site photographs INSPECTIONS: This engineer has performed on -site geotechnical inspections as required by the City of Edmonds. All geotechnical inspection items have now been properly completed, including permanent erosion control measures, landscaping and rockeries. Edmonds Inspection Items / Summary: 1 _ Excavation: Previously verified and approved. 2. Soil Bearing: Previously verified as to proper placement of structural fill and all foundation elements properly placed. 3. Structural Fill: Previously inspected and approved. SOILS • FOUNDATIONS SITE DEVELOPMENT • INSPECTION ■ DRAINAGE • DESIGN & PEWT • LEGAL P.O. Box 55502 Shoreline, WA 98155 - (206) 546-9217 - FAX (206) 546-8442 Mar 11 10 04:05p D. Bruce, P.E. 2065468442 p.2 City of Edmonds Re: Michel Project, 618 Glen Street March 8.2010 Page 2 4. Foundation Bearing: Previously inspected and approved. 5. Subsurface Drainage: Installed and approved. 6. Erosion Control: This engineer has performed periodic inspections, particularly during periods of heavy rains and any snowfall events. No adverse erosional impacts were observed. Contactor properly maintained siltation fencing, rocked construction entrance, and confinement of all work within property limits. Final inspection verified all permanent erosion control measures have been properly completed: landscaping rockeries and landscaping (including beauty bark placement, shrubbery, and lawn). There are no exposed earth surfaces. All permanent erosion control measures have been properly completed and are geotechnically approved. SUMMARY: • All geotechnical inspection items per City of Edmonds have been properly completed, including all permanent erosion control measures and stabilization rockery walls. This report completes geotechnical inspection duties by D. Bruce, P.E. If there are any questions, do not hesitate to call. eta Dennis M. Bruce, P.E. Geotechnical / Civil Engineer DMB:vlb CC' Michel Construction