Final Geotechnical Letter, BLD20140317, 15911 74th Pl W, Edmonds.pdfI July 15, 2016 Mr. Leroy Saunders c/o Mr. Laurey Tobiason Tobiason & Company, Inc. 20434 10h Place SW Seattle, WA 98166-4106 Re: Final Geotechnical Inspection Letter New Single Family Residence 15911 - 74" Place West Edmonds, WA Permit #: BLD20140317 Dear Mr. Saunders, Geotechnical Er sneers, Geologms & Envi-0-timerital Specialists This is our final letter summarizing the geotechnical inspections for the project. Geotechnical inspections were conducted by GEO Group Northwest from October 8, 2015 through March 31, 2016 and 71 field reports were generated. The field reports were provided to the City of Edmonds, the property owner - Mr, Leroy (Dean) Saunders, and the general contractor - Murphy Building Company. In accordance with the special inspections requested by the City of Edmonds, our inspections consisted of following: I Monitoring of the site excavation: The site appeared stable during site excavation. Site excavation occurred for the house foundation, the catchment retaining wall at the back of the lot and for the construction of the Ultra block retaining walls along the north and west sides of the lot. 2. Soil preparation and compaction: The house foundation and rear catchment, retaining wall are supported on pipe piles and the subgrade was acceptable. Soils supporting the north and west block retaining walls were confirmed to be firm and acceptable for supporting the walls. The driveway subgrade soil was confirmed to be satisfactory. Compaction of fills was observed for the driveway utility crossings, below the garage slab and below the front patio slab and confirmed to be satisfactory based on probing. 13240 NE 201h Street, Suite 10 Bellevue, Washington 98005 Phone 425/649-8757 Fax 435/649-8758 July 15, 2016 15911 - 74,h Place West, Edmonds Geotechnical Final Letter 3. Retaining wall construction: Construction of the Ultra block retaining walls along the north and west sides of the lot was observed and the wall construction appeared satisfactory. 4. Pipe pile installation: The installation of the pipe piles was monitored and the specified pipe pile driving refusal criteria was verified. Based on our observations the piles were installed in accordance with the plans and specifications. 3. Footing/retaining wall drain installation: We observed the installation of perforated 4-inch diameter PVC footing drains behind the Ultra block retaining walls, behind the rear catchment concrete retaining wall and around the perimeter of the house. The footing drain was bedded in washed rock and the washed rock protected by geotextile filter fabric. A drainage zone of 5/8 inch crushed rock was installed behind the Ultrablock retaining walls. 6. Wet Season Monitoring: Temporary erosion and sediment control was monitored during the wet season (October thru March): Site inspections were performed following storm events and on a weekly basis durinc,?-I the wet season. Site erosion control measures were installed and regularly maintained by the general contractor and no offsite erosion control issues were observed. Based on our site observations it is our opinion that the geotechnical aspects of the project were completed in conformance with the geotechnical recommendations for the project. GEC} Group Northwest, Inc. July 15, 2016 15911 - 74'h Place West, Edmonds Geotechnical Final Letter 0 Please contact us if you have any questions. Sincerely, GEO GROUP NORTHWEST, INC. X7 Al I William Chang, P.E. Principal N cc: Mr. Bob Murphy, Murphy Building Company (rcm@murphybuilding.com) Patrick Lawler, City of Edmonds (Patrick.lawler@edmondswa.gov) Kristin Johns, City of Edmonds (Kristin.johns@edmondswa.gov) JoAnne Zulauf, City of Edmonds (JoAnne.zulauf@edmon-dswa.gov) GEO Group Northwest, Inc.