Final Inspection - Correction Notice 19110 80th Ave W..pdfFrom:
Rivera, Chris
To:
"Todd C�toddomacdonaId. corn"
Subject:
Final Inspection - Correction Notice 19110 80th Ave W.
Date:
Friday, March 27, 2015 3:48:04 PM
Todd,
Thanks for forwarding the message and sending the photos. Though, unfortunately the connections
and bends within the force main are not approved methods for installation (please see attached
handout E62). This will need to be re -done and inspected. The existing cleanout within your
driveway near the grinder pump does not need to be a 12" iron cover as discussed. Regards to the
water valves, I have an email out to our Water Division Lead to check to see if there is anything
required. Below is an itemized list (including above mentioned) that will need to be addressed prior
to final sign off.
Corrections
1. Please provide an as -built for storm, water and sewer. Please provide information pertaining to
material, size and depths also rim and invert elevations of CB's/yard drains.
2. Please re -due the force main connection, grinder pump to gravity feed sewer line, call in for an
inspection before backfilling.
3. Payment upfront covers 8 inspections, currently our records show a total of 12 inspections. Any
other inspections will be added and will need to be paid prior to certificate of occupancy.
4. Required work to valve cluster, pending.
If you have any questions, please feel free to contact me.
Thank you,
Chris B. Rivera
Engineering Technician
City of Edmonds
121 5th Ave. N.
Edmonds, WA 98020
425.771.0220 ext. 1339
Chris.Rivera(@edmondswa.gov