March 2, 2017
City of Edmonds
Attn: Building Official
Edmonds, WA
Re: John Rettenmier
620 Glen St.
Edmonds, WA
Contractor:
Michel Construction
Final inspection report for Building Enclosure Elements for Building
Diane G
All inspections performed at the project were based on the builder's plans and
specifications, product manufacturer's specifications, and good industry standards a
practice. All references made are to the plans and specifications developed specific;
for the project. Course of construction inspections were performed of the building
enclosure for the purpose of quality application of material to meet city approved pl.
and specifications. Site inspection reports were submitted during course of construc
and a full report and photos was submitted to owner.
All following areas were inspected and observed to be completed with no outstandir
correction items.
Window flashing and installation; sliding door flashing and installation; weather bar
siding flashing and trim caulking; deck to wall attachment flashing; and exterior
penetrations.
m�itted by:
ane Glenn
Construction Consultants of Washington, LLC
Building Enclosure inspector