Loading...
Final Inspection report.pdfZ2�r e"&4" March 2, 2017 City of Edmonds Attn: Building Official Edmonds, WA Re: John Rettenmier 620 Glen St. Edmonds, WA Contractor: Michel Construction Final inspection report for Building Enclosure Elements for Building Diane G All inspections performed at the project were based on the builder's plans and specifications, product manufacturer's specifications, and good industry standards a practice. All references made are to the plans and specifications developed specific; for the project. Course of construction inspections were performed of the building enclosure for the purpose of quality application of material to meet city approved pl. and specifications. Site inspection reports were submitted during course of construc and a full report and photos was submitted to owner. All following areas were inspected and observed to be completed with no outstandir correction items. Window flashing and installation; sliding door flashing and installation; weather bar siding flashing and trim caulking; deck to wall attachment flashing; and exterior penetrations. m�itted by: ane Glenn Construction Consultants of Washington, LLC Building Enclosure inspector