Loading...
final letter.pdfJanuary 29, 2018 RECEIVED Irerracon City of Edmonds Building Division 121 5th Ave N Attn: Ms. Dee Garrison «N 31 2018 DEVELOPMENT SERVICES COUNTER Re: Final Summary of Special Inspections Edmonds Memory Care 7208 & 7220 21Oth Street Edmonds, Washington Building Permit No. BLD2O150032 Terracon Project No's. 81151026, 81145OO6A Dear Ms. Garrison Terracon Consultants, Inc. (Terracon) respectfully submits this letter to acknowledge that the requested special inspections have been completed for the above -referenced project. Terracon conducted structural special inspections for this project (81151026) from July 29, 2015 through November 2, 2017 as described by our Daily Field Report No's. 1 through 128. Terracon also conducted geotechnical special inspections for this project (81145OO6A) from July 20, 2015 through November 12, 2015 as described by our Daily Field Report No's. 1 through 18. These reports, copies of which were previously submitted, form the basis for this final summary of our inspections. In accordance with the provisions of the 2012 International Building Code, Terracon conducted inspections for the following: Reinforced Concrete Lateral Wood Bolting in Concrete Lateral Connections/Holdowns Structural SteelNVelding Grading/Soils Firestopping Pipe Piles Elastomeric Coating -I erracon ora nor perrorm the ronowing inspecnons: iwowure uumura arm iwum rNumeuiauun To the best of our knowledge, it is our understanding that the work which was inspected as referenced in our Daily Field Reports was constructed in general conformance with the approved plans, building codes, and any changes authorized by the structural engineer. If you have any questions or desire additional information, please call at your convenience. Sincerely, Terracon Consultants, Inc. David A. Detterich Project Manager Terracon Consultants, Inc. 21905 641h Ave. W Suite 100 Mountlake Terrace, WA 98043 P 425-771-6632 F [425] 771-3549 terracon.com