final letter.pdfJanuary 29, 2018 RECEIVED Irerracon
City of Edmonds
Building Division
121 5th Ave N
Attn: Ms. Dee Garrison
«N 31 2018
DEVELOPMENT SERVICES
COUNTER
Re: Final Summary of Special Inspections
Edmonds Memory Care
7208 & 7220 21Oth Street
Edmonds, Washington
Building Permit No. BLD2O150032
Terracon Project No's. 81151026, 81145OO6A
Dear Ms. Garrison
Terracon Consultants, Inc. (Terracon) respectfully submits this letter to acknowledge that the
requested special inspections have been completed for the above -referenced project.
Terracon conducted structural special inspections for this project (81151026) from July 29, 2015
through November 2, 2017 as described by our Daily Field Report No's. 1 through 128.
Terracon also conducted geotechnical special inspections for this project (81145OO6A) from July
20, 2015 through November 12, 2015 as described by our Daily Field Report No's. 1 through
18. These reports, copies of which were previously submitted, form the basis for this final
summary of our inspections. In accordance with the provisions of the 2012 International Building
Code, Terracon conducted inspections for the following:
Reinforced Concrete
Lateral Wood
Bolting in Concrete
Lateral Connections/Holdowns
Structural SteelNVelding
Grading/Soils
Firestopping
Pipe Piles
Elastomeric Coating
-I erracon ora nor perrorm the ronowing inspecnons: iwowure uumura arm iwum rNumeuiauun
To the best of our knowledge, it is our understanding that the work which was inspected as
referenced in our Daily Field Reports was constructed in general conformance with the
approved plans, building codes, and any changes authorized by the structural engineer. If you
have any questions or desire additional information, please call at your convenience.
Sincerely,
Terracon Consultants, Inc.
David A. Detterich
Project Manager
Terracon Consultants, Inc. 21905 641h Ave. W Suite 100 Mountlake Terrace, WA 98043
P 425-771-6632 F [425] 771-3549 terracon.com