Final Report 18140 84th St SW_JACOBSON.pdfGG
THE GALLi GROUP
Geotechnical Consulting
August 28, 2015
TGG Project 1810-3
City of Edmonds Development Services Department
121 5th Ave N
Edmonds, WA 98020
Subject: Final Letter for Special Inspections
18140 84th St SW
Edmonds, Washington 98026
BLD20140204
Attention: Patrick Lawler
This letter is to certify that the special inspections for the above project have been
completed and the project work is done. The work was completed in conformance with
the approved plans. The following tasks were part of our special inspections:
• Temporary Erosion and Sediment Control The contractor installed a silt fence on
the downhill side of the activity area. Work was completed during the drier
season.
• Drainage Installation for Wall The contractor installed back of wall drainage
behind the blocks and connected to existing drainage system that routes water to
the toe of the slope.
• Redirection of Drainage for Existing Impervious Surfaces Existing downspout
lines disturbed during construction were directed westward to existing collection
system that routes water to the toe of the slope
• Permanent Erosion and Sediment Control The contractor negotiated with the
homeowner to complete the final erosion control. We requested that the soil
below the wall be amended with mulch, topcoated with mulch, and then planted.
That work has been completed as of 8-27-2015.
PO Box 30759, Seattle, WA 98113 206-525-5097
Final Special Inspection Letter
18140 84th St. SW
BLD20140204
August 28, 2015
All grading and construction was complete as of 8-27-2015. I have attached copies of
our field reports for the wall installation which were previously emailed to Patrick
Lawler, but are include here for ease of review.
Sincerely,
THE GALLI GROUP
Paul L. Stoltenberg, P.E.
Senior Geotechnical Engineer
Attached: Field Reports
Final Report 18140 84th St SW JACOBSON 2 The Galll Group
1HI GAul am
Geotechni"I Consulting
DAILY FIELD REPORT
PROJECT rnn Wrl
BUILDING PERMIT PERMIT OR JOB NO. f34Q —DATE
FEELD REPRESENTATIVE
CLiENTIOWNER
CONTRACTOR
CONSTRUCTION OPERATIONS
OBSERVATION NOTES:
refa
' r �
1�%i- L ✓ t _ . - -
BY
White - Job File, Yellow - Contractor, Pink - Client
MGm Rill CROUP
GeofechnicaI Consulting
DAILY FIELD REPORT
PROJECT i S JOB NO. — f� (4�
BUELDING PERMIT OR JOB NO. 22 1125.(q 0 00 _ _ DATE � - S ` t S
FIELD REPRESENTATIVE
CLEMOWNER
CONTRACTOR r
CONSTRUCTION OPERMONS ZjL F ,:::;
OBSERVATION NOTES:
�w_
C-UT4:*�
1 z1v
Z a
-.11 u r C /_
c.i u E
.Q
OgL1�
7
Zb
io
�-- 1e { 7
iCT
i
CC:
BY
White - Job File, Yellow - Contractor, Pink - Client
THE GALLI GROUP
Gcoteckinical Consulting
Site Address:
TGG Representative:
Contractor:
Owner:
Pile No.
Depth
P1
18.5
•------- ----------r------------
P2
; 19
' 185
P4
21.5
------------------r-------
P5
------------------------------
Z
P6
1 19
P8 18
-------------------r`------- ------•
------- Pg-------t--------� $-------
P10 17.5
P1117
P12 ; 17.5
------- P13 16
-----4 ------ ----------
P14 17
P15 i 15.5
-------- ----------------------------
P16 15
------------------t-------------------
P17 ; 16
------ P 18 __----r------ 6-------
.------------------4_--__________--_---
.------------------L_--________--___---
AL
Daily Field Report
Pin Pile Installation
Permit #BLD20140204
18140 84th Ave W
Date:
4/8/15 - 4/9/15
Paul Staltenberg, P_E
Hammer:
140 lb Rhino
------------------
------McDowell Pile Kin
Refusal:
------------
60 see/inch
- __---
Jacobson
--------------
Pile Type:
2" Schad 80 G
Pile No. Depth
Pile No.
Depth
--------------------------------------
--------------
------------------- Y------------
-------------------- -----------------•
------------------
-------------------------------- --
Phone: 206-525-5W
1810 Pin Pile Summary_.lacobson 04142014 PO Box 30759, Seattle, WA 98113 Fax: 206-525-5091
rl y
lZ
f:- .
IT
ZL
AL
yp
�=--����' EX HOUSE
- �:-=���-`�-=-= -=�' HELICAL ANCHORS
Pam ® 6'—O" OC, TYP
r
81
Jlt
�6s _ + F007iNG DRAIN PER
DETAIL 3/53.1
TV
'P7'
164
ROTECT EX VIDE
''8 MAPLE ROOT
Pit
TOW = 164.0
L ,
STORM DRAIN
SE OF SLOPE
1/0
ssMH • —
RIM=162.85' 3
�f
\
,
IGO]
TIE Ai,LI GROUP
(ieotechnical Consulting
Daily Field Report
Helical Anchor Installation
Permit#20140204
Site Address:
18140 84th Avenue W, Edmonds
Date:
4-10 to 4-14-2015
TGG Representative:
Paul Stoltenberg, P.E
Anchor:
8-10-12 Helical Anchor
Contractor:
McDowell NW Pile Kin g _ ___________________
Design Load:
_ - -
8 kips �9500_rev)
Owner:
Jacobson
Conversion:
10x1.5xpsi=Ibs _______
Anchor No. Design Load Gauge (psi) Correlation L (ft) Kip/psi Final Load
Al I 8,000 2000 I 30000
- -----� - - ---_-- 0 22--------� �- +------------------ -
----8^000 2000-----_----_-10-------- 22 1.5 '-----30000
- ----------------- 1 O 22-------- i ------•--- --------
----�---------►-------------+------30000 ------
_------A4 -- ---- , 000 -----------2000 I ----------------- ------
a _8_000 _ 2000_____ 10 22 --- I 30000
------- A5------------ 8,000 ----- 2000 I 30000
•--------------------------1-0-------- 22--------� 5-------i--------------------
__-- 8,000 2000 1022 -- - 1.5 i -- 30000
------- A6-------,- 8,000-----------2000----- ----10 22 1--------�-
------ A7-------+ ------------------------------------------------ 30000
------A$8,000 ___-- 2300 -- 1 10 27 1.5 34500
--------------------------------------
` 8,000 1500 - ---10 - ----- 22 1.5 I _ 22500
-------A10------t--=--8,000----_..____--2500------�•-----------------------------------i---- - -- -- - -
1Q-- 22 1.5 37500----
___-- 8,000 1250------1018750 __----_ 40 1.5 I
I
I
1 ,
•------------------------------------- •----------------� r------------------------------------'
NOTES: *All anchors consisted of 8"-10"-12' triple helix lead section 7 feet long except anchor
A-11 which was installed first. Anchor A-11 consisted of 5-ft lead section with 6"-8" double
helix installed at 20 degrees per plan. In order to save material costs the geotechnical engineer
recommended steepening the angle from 20 degrees to 40 degrees. Contractor recommended
switching to triple helix and geotechnical engineer approved. Consulted with structural engineer
(CG Engineering) who confirmed that piles had extra capacity for additional vertical load and that
the design working load for the anchors was only 8 kips. Structural engineer approved the
field change and after anchor A-11 (first anchor installed) was installed the contractor switched
to the steeper anchor with triple helices. The result was anchors achieving the minimum req'd
depth (15 feet) and testing out at more than 200% of the design working load.
The Galli Group load tested anchors A-11 and A-9 in the field against the earth embankment
and concluded that the anchors achieved at least 200 percent of the design load without
creep of the anchor. Testing was conducted with 60-ton ram and power team.
Load testing confirmed that the assumed correlation factor from torque (psi) to axial load
was appropriate for the anchors in these soil conditions.
Numbering scheme for anchors coforms to that shown on project plans.
Phone:206-525-5097
1810_Anchor Field Report Summary 04142015 - PO Box 30759, Seattle, WA 98113 Fax: 206-525-5091
----- -- _L--�
- ~ ---- ----
4Ly
yp
`�--- EX HOUSE
-�_____=________ -=-------- / HELICAL ANCHORS
--___ ---_� --- -__ -_ -- 0 6'-0' OC, TYP
_---- s-------- /
FOOTING DRAIN PER
_ DETAIL 3/S3.1 '
... 1P4 � • �'�` -- __ - _ a a �� e r . �,�����-mil
TT
164,
ROTECT EX VINE
MAPLE ROOT
TOW - 164.0'
�/,/ ]jam V:r
�..\�` t ;ram' •` _J � \ �. \ \ \.� \ •:�•5
STORK �+GIR/A�IN
SE OF SLOPE
s \ rr• o
ssm
RIM=162.85' 3
. \ r
4s . tl
's
f
� 1
MGlmhu gm
Gulechnical Cansuliing
DAILY FIELD REPORT
PROJECT &I 1 y G�i JOB NO.
BUILDING PERmrr OR JOB NO. _ 6 itl <2 Z,,2 el DATE &F — ( Z " ZE
FIELD REPRESENTATIVE
CLEENT/OWNER
CONTRACTOR
CONSTRUCTION OPERATIONS G
OBSERVATION NOTES:
CC:
6
BY Sri toy_ \—'\ TO
White • .Job File. Yellow - Contractor. Pink - Client