Loading...
Final Short Plat Approval Memo.pdfCITY OF EDMONDS ENGINEERING DIVISION Date: December 5, 2016 To: Kernen Lien, Senior Planner From: JoAnne Zulauf, Engineering Technician Subject: PLN20150053, Select Homes - Final 20226 Maplewood Dr — 2 lot Short Plat The Engineering Division has found that the subject 2-lot short plat meets the requirements established for civil subdivision improvements in accordance with Edmonds Community Development Code (ECDC) 20.75. Preliminary plat approval was issued by the Planning Division on March 22, 2016 and included engineering conditions of approval in Attachment 4 of the staff report. Civil construction plans were submitted to the Engineering Division on April 4, 2016 consistent with the conditions of approval and ECDC 20.75.120. The plans were approved for construction on August 30, 2016. While most of the improvements have been installed and inspected, the plat construction has yet to be completed in it's entirety. Consistent with ECDC 20.75.130, a performance bond has been posted as surety that these improvements will be completed within 12 months following recording of the plat. A performance bond was submitted by the developer and accepted by the City on September 1, 2016 reflecting the total cost to construct all required improvements in the amount of $59,958.60. The subject development did not include street dedications to the City. Thank you. City of Edmonds