September 21, 2019
Mr. Slavik Miniaylo
7316-1641h Street SW
Edmonds, WA 98026
Re: DRAFT Statement of Project Completion for
Retaining Wall Remediation at 7316-1641h Street SW
Permit # BLD2018-0573
Edmonds, Washington
Our Reference: J111-01-16
Dear Slavik:
We provide this statement of project completion at the request of the City of Edmonds
(City) as it pertains to all the work done on and around the block walls in the back yard,
north of your residence and the tight -line drainage system that carries surface water from
those same walls to the creek below and to the north.
This remediation project, as of our final site review on Thursday September 9, 2019 was
completed on September 19, 2019 with the final placement of grass seed on the newly
placed soil area. ARC observations were guided by the conditions outlined in our drawings
and recommendations and followed the City of Edmonds, Special Inspection and Testing
Agreement we executed on June 28, 2018.
The work was tracked by the Geotechnical Engineer of Record (ARC). The responsibilities
were assigned according to authorship of those parts of the project where ARC was
responsible for the retaining wall remediation and the drainage system. ARC provided all of
the daily field reports for the project to the City and Mr. Miniaylo with a final site meeting
indicating substantial completion.
Based on the observations of ARC professional engineers and geologists this project has
been completed in substantial compliance with the plans and specifications approved and
permitted by the City.
LIMITATIONS
Work for this project was performed, and this letter prepared, in accordance with our
Change Order # CO-F under our original contract dated April 13, 2016 . ARC has
completed this work in accordance with generally accepted professional practices for the
Slavik Walls
September 21, 2019
J-111-01--16
nature and conditions of the work done in the same, or in similar localities, at the time the
work was performed. This report is intended for the exclusive use of you and your
contractors and/or consultants for specific application to the referenced property. We
make no other warranty, express or implied.
Subsurface conditions interpreted from exposed soil materials and seepage conditions
encountered formed the basis for developing our work products. The nature and extent of
conditions may change over time and may not become immediately evident. If significant
variations appear evident at a later date, ARC should be consulted to re-evaluate the project
site. It should be noted that groundwater seepage and any fluctuations in the level of the
groundwater are dependent on seasonal variations in precipitation events, temperature, and
other climatic factors. These factors may impact the performance of the project over time
and the owners should continue to monitor the remediated area.
ADAMS Resource Consultants Company Page 2of3
PO Box 1770 1 Duvall, Washington 98019-1770 1 Tel 425.788-3244 / Fax 888-248-8629 / www.AdamsResource.com
Slavik Walls
September 21, 2019
J-111-01--16
We appreciate this opportunity to work with you on your project. If we may provide any
additional information or clarification about this letter, please do not hesitate to contact
Wayne at 425.466.2891(cell) or by message at 425.788.3244.
Sincerely,
ADAMS RESOURCE CONSULTANTS COMPANY
y2AI20�9
;ed
g Geo 09
10
O
Geoff
ie C. Adams
WAYNE C. ADAMS, PE, PENG, EG
President/CEO
ADAMS Resource Consultants
wayne@AdamsResource.com
WCA-Final stmnt of cmpltn Itr 9-20-2019.docx
ADAMS Resource Consultants Company Page 3of3