Final stmnt of cmpltn ltr 9-21-2019.pdfADAMS RESOURCE CONSULTANTS September 21, 2019 Mr. Slavik Miniaylo 7316-1641h Street SW Edmonds, WA 98026 Re: DRAFT Statement of Project Completion for Retaining Wall Remediation at 7316-1641h Street SW Permit # BLD2018-0573 Edmonds, Washington Our Reference: J111-01-16 Dear Slavik: We provide this statement of project completion at the request of the City of Edmonds (City) as it pertains to all the work done on and around the block walls in the back yard, north of your residence and the tight -line drainage system that carries surface water from those same walls to the creek below and to the north. This remediation project, as of our final site review on Thursday September 9, 2019 was completed on September 19, 2019 with the final placement of grass seed on the newly placed soil area. ARC observations were guided by the conditions outlined in our drawings and recommendations and followed the City of Edmonds, Special Inspection and Testing Agreement we executed on June 28, 2018. The work was tracked by the Geotechnical Engineer of Record (ARC). The responsibilities were assigned according to authorship of those parts of the project where ARC was responsible for the retaining wall remediation and the drainage system. ARC provided all of the daily field reports for the project to the City and Mr. Miniaylo with a final site meeting indicating substantial completion. Based on the observations of ARC professional engineers and geologists this project has been completed in substantial compliance with the plans and specifications approved and permitted by the City. LIMITATIONS Work for this project was performed, and this letter prepared, in accordance with our Change Order # CO-F under our original contract dated April 13, 2016 . ARC has completed this work in accordance with generally accepted professional practices for the Slavik Walls September 21, 2019 J-111-01--16 nature and conditions of the work done in the same, or in similar localities, at the time the work was performed. This report is intended for the exclusive use of you and your contractors and/or consultants for specific application to the referenced property. We make no other warranty, express or implied. Subsurface conditions interpreted from exposed soil materials and seepage conditions encountered formed the basis for developing our work products. The nature and extent of conditions may change over time and may not become immediately evident. If significant variations appear evident at a later date, ARC should be consulted to re-evaluate the project site. It should be noted that groundwater seepage and any fluctuations in the level of the groundwater are dependent on seasonal variations in precipitation events, temperature, and other climatic factors. These factors may impact the performance of the project over time and the owners should continue to monitor the remediated area. ADAMS Resource Consultants Company Page 2of3 PO Box 1770 1 Duvall, Washington 98019-1770 1 Tel 425.788-3244 / Fax 888-248-8629 / www.AdamsResource.com Slavik Walls September 21, 2019 J-111-01--16 We appreciate this opportunity to work with you on your project. If we may provide any additional information or clarification about this letter, please do not hesitate to contact Wayne at 425.466.2891(cell) or by message at 425.788.3244. Sincerely, ADAMS RESOURCE CONSULTANTS COMPANY y2AI20�9 ;ed g Geo 09 10 O Geoff ie C. Adams WAYNE C. ADAMS, PE, PENG, EG President/CEO ADAMS Resource Consultants wayne@AdamsResource.com WCA-Final stmnt of cmpltn Itr 9-20-2019.docx ADAMS Resource Consultants Company Page 3of3 PO Box 1770 / Duvall, Washington 98019-1770 / Tel 425.788-3244 / Fax 888-248-8629 / www.AdamsResource.com