Loading...
Final_Approval_Pump_Design_7-19-16.pdfLambert, Jennifer From: Colleen Mitchell <cmitchell@herrerainc.com> Sent: Tuesday, July 19, 2016 10:08 AM To: Lambert, Jennifer Cc: Rebecca Dugopolski Subject: RE: BLD20151252 - 810 9th Ave S Hi Jennifer, The applicant has satisfied my last 2 comments. Thank you, Colleen COLLEENITC LL, PE cell 360.961.6266 1 desk 206.787.8231 1 main 360.398.5075 From: Lambert, Jennifer [mailto:Jennifer.L mbert edmondswa. o f Sent: Tuesday, July 19, 2016 8:46 AM To: Colleen Mitchell <cmitchellPherrerainc.com> Cc: Rebecca Dugopolski <r 'u9ppolski herreralnc.cg > Subject: FW: BLD20151252 - 810 9th Ave S Colleen, Can you please see the email below and let me know if I can approve? Thanks, Jennifer From: John Yuen [ailto;JohnY@lsaen uneerin .om] Sent: Friday, July 15, 2016 4:08 PM To: Lambert, Jennifer Cc: Scott Schrieber Subject: RE: BLD20151252 - 810 9th Ave S Hi Jennifer, Attached please find the responses letter to the review comments dated July 13, 2016 for your review and consideration. If approved, Plans revision is not required.. Drainage Report may not required to be re -submitted, only need to cross out the statement in the Drainage Report under Section D (page 31 of the Drainage Report) — "The function of the hour meter installed for each pump is for auto switching between duplex pumps based on hours of operation." Please advise. Thank you and have a Nice Weekend. ' Lovell-Sauerland and Associates, Inc. Phone: 425-775-1591 ! A� Y @. k 0 A d V 1921736th Avenue West, Suite 106 Z VI . M — Lynnwood, Washington 98036 LSAEngineering.com Memorandum File No. 5325 Date: July 15, 2016 To: Jennifer Lambert City of Edmonds Engineering Division From: John Yuen Subject: Application #: BLD20151252 & BLDF20151536 (pool) Project: Ronquillo Project Address: 810 9th AVE S. This memo addresses the review comments made by the City of Edmonds Engineering Division staff on July 13, 2016 for the Ronquillo single family residence. The following list summarizes the comments with the corresponding changes made to the application and plans. Additional fees, bonds, plans and insurance will be provided as needed at a later date. BLD20151536 - Pool 1) OK 2) Plans are not consistent with the Site Plan and Civils (i.e. there is a stairs and planters shown to the west of the pool patio). Please revise such that all plans sheets are consistent. BLD20151252 - SFR SITE PLAN 3) As changes are made to other plan sheets, please revise this sheet as needed. Noted. 4) OK 5) OK 6) OK 7) OK 8) OK Love] l-Sauerland and Associates Correction Response Memo LSA No. 5325 Ronquillo July 15, 2016 New Comment - 5/20/16 14) OK 15) OK Storm Drainage Plan and Details C3 of 5 1) OK 2) OK 3) OK 4) OK 5) OK 6) OK New Comment — 5/20/16 7) OK 8) OK 9) OK 10) OK 11) OK 12) OK Lovell-Sauerland and Associates Ronquillo Correction Response Memo July 15, 2016 LSA No. 5325 L.FI [3] • Provide an explanation on how pumps will alternate in operation, per requirement #6 in the "Use of Pumping Systems for Conveyance of Stormwater on Private Property", ENGR-DEV(STM)-2011-02. • Is there a backup power supply for the pump, per requirement #6 in the "Use of Pumping Systems for Conveyance of Stormwater on Private Property", ENGR-DEV(STM)-2011- 02? Is there an overflow path for stormwater (if the pump were to fail) per requirement #7 in the "Use of Pumping Systems for Conveyance of Stormwater on Private Property", ENGR-DEV(STM)-2011-02 that does not result in: o Flooding of a building or emergency access o Erosion or downstream sedimentation o Slope failure 12/17/15 - Comment from Jerry Shuster.- The pump system must comply with all the requirements in the City of Edmonds Stormwater Pumping policy: http://www.edmondswa.gov/images/COE/Government/Departments/Public Works/Policies/ENG R-DEVSTM-2001-02.Pumping. Private Property.pdf. The requirements in this document includes, but is not limed to, gravity flow of all runoff to the City's storm system, with an internal alarm for pump and/or power, and a backup power source to operate 1 pump. 3) OK Lovell-Sauerland and Associates Ronyuillo Correction Response Memo July 15, 2016 LSA No. 5325 [51 Water and Sanitary Sewer Plan and Details (C5 of 5) WATER 1) OK 2) OK 3) OK SEWER 1) OK 2) OK 3) OK 4) OK 5) OK 6) OK Dry Utilities — Show on sheets C3 & C5 1) OK Thanks for your time and effort in reviewing this material. If you have any questions or need additional information, please do not hesitate to call. John Yuen Lovell-Sauerland and Associates Ronquillo Correction Response Memo July 15, 2016 LSA No. 5325 UOR [7]