Project:
Shaw Lane Detention Vacrh
Address:
8620218
P,ermiIt:
PLN2012-01043
0011,
A.ARTESIING
LABORATORY, WC,
CONSTRUCTION INSPECTION ANU - ATERIAL I -EL L 1
NATION,A L.Y ACCEPTED L AE JWTO;Y
This, is to advise you that special inspections are completed on the above
referenced project. The following inspections were required' and a copies of our
inspection report have already been forwarded to you.
1. Reinforcing steel
2'. Concrete placement
3,. Concrete materials testing
4. Grout materials testing
To the best of our knowledge all work inspected conformed to City of Edmonds
Building Department approved plans, specifications, IBC and related codes
and/or verbal or written instructions from the Engineer of Record.
Sincerely,
A.A.R. TESTING LABORATORY, INC.
Kimberle Anderson
President