Loading...
Final-Special Inspection.vault.12.23.14.pdfF�rep roof in g Aggregates S h o I c r e t e C on c. re te December 23, 20,14 IM a s 0 n I' y A s p 11 a p t File No,, 14-363 R o o f i n g P u i i n g S t e 'a d S 0 i I s Building Official W o 0 d City of Edmonds Building Department 1' 1 21 5t' Ave. N. zromwsm�M�g Project: Shaw Lane Detention Vacrh Address: 8620218 P,ermiIt: PLN2012-01043 0011, A.ARTESIING LABORATORY, WC, CONSTRUCTION INSPECTION ANU - ATERIAL I -EL L 1 NATION,A L.Y ACCEPTED L AE JWTO;Y This, is to advise you that special inspections are completed on the above referenced project. The following inspections were required' and a copies of our inspection report have already been forwarded to you. 1. Reinforcing steel 2'. Concrete placement 3,. Concrete materials testing 4. Grout materials testing To the best of our knowledge all work inspected conformed to City of Edmonds Building Department approved plans, specifications, IBC and related codes and/or verbal or written instructions from the Engineer of Record. Sincerely, A.A.R. TESTING LABORATORY, INC. Kimberle Anderson President CC-, Echelbarger Investments -Jeremy Ball Tek (425) 88-1-58"12 FaX1 (11.25) 881-54dl �, '7126 180t1 Ave. NE F1.0, Sox 2523 ,, 119,edmond, VV 98073