Loading...
Fire Comments 2.docx Eagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 98359 hoytjeter@centurytel.net 360 874 0562 Fax 360 874 0591 To: Steve Adamson Columbia Fire st 1534 1 Ave S Seattle, WA 98134 Re: Edmonds Yacht Club 326 Admiral Way Edmonds, WA 98026 Plan Review # 2009-0579 EECE # EDM09-14 (2) Second Comment Letter The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back-check time. SCOPE OF REVIEW Automatic Fire Sprinkler System The scope of this review is for therequirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. Page 2 of 3 Plan Review Number 02 EECE#: EDM 09-14 (2) Edmonds Yacht club 2009-0579 SPRINKLER COMMENTS General 1.The hydraulic calculations for this project were not submitted. The plan has been reviewed without the calculations but they must still be submitted for final approval. IFC 105.4, IFC 901.2, NFPA 13, 22.3 Columbia fire attached hydraulic calculations to email and sent to City of Edmonds. OK Sheet 3 2.Riser detail: Provide a gauge below the backflow prevention valve. NFPA 13, 7.1.1.1 Columbia Fire added Gauge below backflow. This appears not to be added to the drawings as noted in the response. 3.Main Floor: Provide a four-way brace at the change of direction on the main located near grid D-6. This will serve as a longitudinal brace for the segment of the main which runs parallel with gridline D and as a lateral brace for the section of main which runs parallel with gridline 6. Additionally, provide a lateral brace at the right end of the main which runs parallel with gridline 6. NFPA 13, 9.3.5.3 and 9.3.5.4 Columbia fire added all additional EQ as directed. Additional details are not added to addresses the required bracing. Please revised and resubmit. 4.Sprinkler Information Chart: Adjust the sprinkler head count for the dry sidewall sprinklers to reflect the actual number of heads shown on the plans. (5) NFPA 13, 22.1.3 Columbia fire adjusted sprinkler head count to 5 dry sidewalls. This information is not shown on the resubmitted drawings. 5.Upper Floor: Provide a longitudinal brace within 40 feet of the upper end of the main located along gridline D. NFPA 13, 9.3.5.4 Columbia fire added additional EQ as directed. This information is not shown on the resubmitted drawings. Page 3 of 3 Plan Review Number 02 EECE#: EDM 09-14 (2) Edmonds Yacht club 2009-0579 Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (360) 874-0562 between 8:00 a.m. and 5:00 p.m. By: Hoyt Jeter, P.E. President